Laserfiche WebLink
Q: Is the building one or two stories in height? <br />A: The building is one story in height but does contain a small (1,200 square foot) <br />mezzanine. <br />Q: How many will be working in the building? <br />A: Approximately 10 employees will occupy the building. <br />Q: Parking needs to be reverified as there will not be 70 new parking spaces on the north <br />parcel but more like 15. <br />A: The 64 new spaces referred to are the number of stalls on the north parcel that will now <br />be available for the industrial park to utilize. These spaces were previously exclusive to <br />the former automotive uses. Approximately 44 spaces will be new as they will be where <br />the demolished building was located. <br />Q: What is the maximum size of truck that will be studied? <br />A: We will be looking at turning movements for 50-foot long trucks. <br />Q: The 2019 approved SD prohibited outdoor play areas. Why the changes to allow an <br />outdoor play area now? <br />A: A combination of factors such as typical schools have outdoor play areas, families prefer <br />outdoor areas, an lessons learned from covid are led to the decision to pursue an <br />outdoor play area. <br />Q: Our biggest concern besides truck circulation is we can't find a parking spot. <br />A: The revised site plan will provide additional parking opportunities for the industrial park <br />to use. <br />Q: Will this project move forward if we can't address the truck circulation issue? <br />A: We still intend to find a solution that works for all parties. However, the plan will be to <br />move forward if an acceptable option is not found. <br />City Council 26 — 290 1/16/2024 <br />