Laserfiche WebLink
pursuant to Public Resources Code section 21083.3 and CEQA Guidelines Section <br />15183, the Project is exempt from further review. This type of exemption analysis <br />evaluates whether the potential environmental impacts of the proposed change of use for <br />the existing 5,837-square-foot building from auto -repair to administrative office and site <br />improvements that include new landscape, fagade remodel, and new outdoor areas for <br />the office and the school are addressed in the City of Santa Ana General Plan Update <br />Final Recirculated Program Environmental Impact Report (GPU EIR). A rezoning that is <br />consistent with an adopted general plan falls within this exemption. <br />(A) As set forth in CEQA Guidelines Section 15183(a), projects that are <br />"consistent with the development density established by the existing zoning, community <br />plan or general plan policies for which an EIR was certified shall not require additional <br />environmental review, except as might be necessary to examine whether there are <br />project -specific significant effects which are peculiar to the project or its site." The CEQA <br />Guidelines further state that "[i]f an impact is not peculiar to the parcel or to the project, <br />has been addressed as a significant effect in the prior EIR, or can be substantially <br />mitigated by the imposition of uniformly applied development policies or standards ... <br />then an additional EIR need not be prepared for the project solely on the basis of that <br />impact." CEQA Guidelines Section 15183(c). <br />(B) The GPU was adopted, and the GPU EIR certified, in April 2022 (State <br />Clearinghouse Number 2020029087); the GPU went into effect on May 26, 2022. Any <br />decision by the City affecting land use and development must be consistent with the GPU. <br />The GPU EIR evaluates the potential environmental effects associated with <br />implementation of the GPU and addresses appropriate and feasible mitigation measures <br />that would minimize or eliminate these impacts. A project is consistent with the GPU if its <br />development density is the same or less than the standard expressed for the involved <br />parcel in the general plan for which an EIR has been certified, and the project complies <br />with the density -related standards contained in that plan. CEQA Guidelines section <br />15183(i)(2). Development density standards can include the number of dwelling units per <br />acre, the number of people in a given area, floor area ratio (FAR), and other measures of <br />building intensity, building height, size limitations, and use restrictions. <br />(C) The GPU identifies that the Interim Development Standard for the FLEX-1.5 <br />area is M1. The M1 zone provides for a variety of light industrial uses, including <br />warehousing, manufacture, assembly, machine shops, wholesale businesses and <br />ancillary uses such as office uses that do not exceed thirty (30) percent of the gross floor <br />area. The Project would result in a FAR of 0.14, which is within the projections of the GPU <br />EIR, which evaluated a density of 1.5 FAR on the site. The GPU EIR adequately <br />anticipated and analyzed the impacts of this Project and identified applicable mitigation <br />measures necessary to reduce impacts of the Project, and the Project implements the <br />applicable mitigation measures. <br />(D) Specifically, the Project qualifies for the exemption because the following <br />findings can be made: <br />1. The Project is consistent with the development density established by existing <br />zoning, community plan or general plan policies for which an EIR was certified. <br />Ordinance No. NS-XXXX <br />City Council 26 — 306 1/16/ of 6 <br />