Laserfiche WebLink
Santa Ana Green <br />Santa Ana has a commitment to improving quality of life by reducing carbon pollution and <br />energy use, both from its own operations and from the community as a whole in order to <br />create healthy neighborhoods as a part of the Santa Ana Green Program. The City's <br />General Plan continues to build upon these ideas by providing goals and policies for <br />healthy neighborhood initiatives, which include tree planting, corridor greenways, build - <br />green initiatives, and energy conservation. <br />ReBristol -Tolliver Street Urban Greening <br />The California Natural Resources Agency (CNRA) Urban Greening Grant Program funds <br />projects that reduce greenhouse gases while also transforming the built environment into <br />places that are more sustainable, enjoyable, and effective in creating healthy and vibrant <br />communities. <br />The Public Works Agency (PWA) submitted a successful application for funding from the <br />Urban Greening Grant Program for the Bristol -Tolliver Street Greening Project and was <br />awarded funds on April 3, 2023. The project features the transformation of vacant City - <br />owned parcels at the intersection of Bristol Street and Tolliver Street into a 1.25-acre new <br />community park. The park will include drought tolerant landscaping, shade trees, <br />recreational features, pedestrian pathways, signage, lighting, picnic benches, a <br />stormwater bioretention basin, and a stormwater capture and reuse system for park <br />irrigation. <br />CUTS INLET <br />BRISTOLST. E)OS7ING TREES TO VLNSE DROUGHT CURB CUTLET <br />DECORATIVE Z� BE PROTECTED TOLERANT IANDEGAPING <br />BIKE AREA HIGH FENCE TRASH RECEPTACLE UMP <br />(RACKS AND TIRE CHANGING) INTERPRETIVE SIGN BENCHES BENCH INLET S-ENSIZE UGHFlNG NIH TRASH RECEPTACLE SITE HGHTINC STRUCTURESITE UCJiSNOyiSECURBY CAMEflA \�, \\ At' <br />SECURITY CAMERP <br />771 <br />PARK ENTRY SSII LN —,y, r<A <br />TRASH RE E `� nDr: 4aRJFA OVERFLOW <br />AAA DOG IYASIE STATION ® /' Y K:f� 1 <br />Ex snNc % - © DRAW <br />SIDEWALK, _® - HAIFGBASKETBVJ.L 91[IR OIRT SN,ON <br />5K%ATE PAPR WM_9 AND USE 2,00D SF <br />(­REFCE) Q <br />PAVERS P l 1 -- <br />�.t <br />slcN ENTRY <br />PA Rs AND <br />PARK ENTRY SIGN PICNIC TAKES DRINKING J � \\�� IRRICJ.TION PUMP <br />DECORATIVE 3 HIGR FENCE FOUNTAIN SITE VGHTING TC IRRIGATION // <br />~ DECOMPOSED J 6' MOW CURB <br />WORHOUT ARE0. WIDE PEASE LANDSCAPE TRASH RECEPTACLE <br />a CRANRE WALKWAY REMOVE WALL <br />SSTRUCTURE W gUFEER WITH WALL VINES <br />- _XlSTING ING ETAINININING ALL "R{� ATMENT UNIT <br />O <br />DIVERSION LINE FROM <br />- CATCH BASIN TO <br />STDR AND US HARVEST <br />NV USE SYSTEM <br />TRFF EEC MATERWLS LEGEND <br />EXISTING TREE � BIORETENIT€ON BASIN (BOTTOM) <br />TREE SPECIES 1• BIORETENTION BASIN (SIDE SLOPE) <br />a TREE SPECIES 2• <br />DECOMPOSED GRANITE <br />TREE SPECIES Y <br />DROUGHT TOLERANT LANDSCAPING (DENSE) <br />'PEE SPECIES TO BE DETERMINED DURING FINAL DESIGN <br />DROUGHT TOLERANT LANDSCAPING <br />—SE AND WILL BE NO LARGER ELM 15—GALLON5. <br />TCH BASIN SIGN J <br />PAVERS <br />HESPERIAN SCAT <br />U CAMIRED RUNOFF WILL BE USED TO RIPPLY SGBSURFACE <br />PLAYGROUND SURFACING <br />DRIP IRRCATION THROUGHOUT THE STTE. <br />2. IMPRWFAIENTS WILL BE FINALIZED THROUGH THE FINAL <br />KC PAVEMENT <br />DESIGN PHASE AND IN CONSIDERATION OF ADDITIONAL <br />PUBLIC INPUT. <br />TURF AREA <br />e <br />EE <br />OF­SANTA ANA <br />EE\ <br />,,,;SPY <br />— <br />ELIC WIIRN56GEHCY <br />»Above: Draft site plan for the Bristol -Tolliver Urban Greening project. <br />22 <br />City Council 13 — 28 3/19/2024 <br />