Laserfiche WebLink
TIME <br />ELEMENT <br />REF # <br />EJ <br />IMPLEMENTATION ACTION <br />AGENCY <br />2023 UPDATE <br />FRAME <br />Noise <br />1.2 <br />No <br />OC Streetcar. Monitor implementation <br />PWA <br />Ongoing <br />The City continued to coordinate with <br />of mitigation measures outlined in the <br />Orange County Transportation <br />Final Supplemental Environmental <br />Authority and contractor on all aspects <br />Impact Report for the OC Streetcar. <br />of the OC Streetcar construction, <br />including ensuring mitigation measures <br />are implemented. City staff attend <br />weekly construction meetings and <br />provide oversight inspection of <br />construction activities and National <br />Pollution Discharge Elimination System <br />(NPDES) compliance. <br />Noise <br />2.1 <br />No <br />Alternative paving. Evaluate the use of <br />PWA <br />2024 <br />In 2023, staff recommended a number <br />alternative paving materials that can <br />of cost effective strategies for <br />reduce traffic noise, as feasible, <br />pavement preservation including the <br />depending on roadway conditions and <br />use of rubberized pavements to reduce <br />cost -efficiency. <br />noise. Some strategies include the use <br />of Asphalt Rubber Hot Mix (ARHM), <br />Asphalt Rubber Aggregate Membrane <br />(ARAM), and has reviewed feasibility of <br />utilizing various recycling techniques <br />such as Cold In -Place Recycling (CIR) <br />and Full Depth Reclamation with <br />Cement (CTB). <br />Noise <br />2.2 <br />No <br />Freeways. Continue cooperation with <br />PWA <br />Ongoing <br />Continued cooperation with Caltrans in <br />Caltrans in the planning of noise <br />the planning of noise attenuation along <br />attenuation along freeways and assist <br />freeways and assist with outreach <br />with outreach efforts to notify residents <br />efforts to notify residents of major <br />A-60 <br />City Council 13 — 88 3/19/2024 <br />