My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-03-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
03/19/2024
>
Agenda Packet_2024-03-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2024 4:44:49 PM
Creation date
3/13/2024 4:26:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Integration of multiple system hydraulic and infrastructure condition assessment <br />criteria such as fire flows, leaks, valve criticality, pipeline age, material, and more. <br />The above represents a significant collections of institutional knowledge gained by ou!r staff to <br />develop the City's first -ever hydraulic model, with the application of that model to the City's <br />Water System Master Plan, and deployment of upgraded technology to support a more <br />integrated, dynamic, and informed decision making process for engineering. <br />Proposed Scope and Terms for Ongoing Solutions- By approval of this proposal and subsequent <br />contracting of this proposed scope, the City authorizes Sedaru to provide maintenance and <br />support for engineering software for a 3-year Initial term, with an optional renewal for 2 years.. <br />Annualized support includes 2 categories of solutions; 1) ongoing software maintenance and <br />support for the solutions authorized within the 2015-2018 Water System Computer Model <br />Solutions contract, a nd 2) continued engineering related services to provide similar services to <br />those described herein, including updates to the City's current water model, These solutions <br />have been summarized below: <br />1. $75,000 per year for maintenance and support of the Sedaru engineering software, Inc.-. <br />a. Sedaru Modeling: Run fire -flow analysis, size pipelines, evaluate pumps out of service, <br />b.. Sedaru OMNI & SCADA Connect: Track, trend, monitor, and report -on system <br />performance, Including notifications and alarms of facilities running out of range. <br />c. Sedaru Fieldforce & Auto -Reporting: Collect condition and performance data on key <br />facilities in real-time, to automatically generate production reports. <br />d. Sedaru CIP: Access condition and performance data from GIS, Hydraulic Modet, Street <br />Paving. Rank, weight, quantify & prioritize pipeline replacement projects with high. ROL <br />e. Sedaru Ops; Predict operations to determine water age, and trace water supply to and <br />from any point in the system to reduce the need for future water quality sampling. <br />2. $75,000 per year for ongoing engineering consulting services, delivered on an as -needed. <br />basis:, utilizing the rate schedule included herein as Exhibit A. Consulting services may <br />include and not be limited to: <br />a. Updates to the City's water system hydraulic model, and related calibration efforts, to <br />ensure reasonable water model results as compared to field or SCADA measurements. <br />b. Updates may also include water quality parameters to support. the City's annual flushing <br />program to maintain acceptable levels of water quality. <br />c. Ongoing fire flow capacity analysis for developer requests, deficiency analysis to ensure <br />high value return -on -investment on pipeline replacement projects, and simulations of <br />water system operations including pump controls, water quality, and more. <br />d. Hydraulic model updates and related model results will provide the City's Sedaru <br />software with the latest information on City Infrastructure and operations to support <br />optimal software performance overtime. <br />Total annual value of the contract is $150,000, and software maintenance is to be billed and <br />paid: in advance of each contract year. Consulting services billed on a percentcomplete basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.