My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 23 - Amendment Application (Zone Change) No. 2024-01 to Amend the Zoning Map
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/02/2024
>
Item 23 - Amendment Application (Zone Change) No. 2024-01 to Amend the Zoning Map
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 9:25:22 AM
Creation date
3/27/2024 8:17:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
23
Date
4/2/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AA No. 2024-01, CUP No. 2024-01, and CUP No. 2024-02 for McDonald's Restaurant at <br />2101 and 2109 E. Santa Clara Avenue <br />February 26, 2024 <br />Page 6 <br />The project would be required to meet all development standards and would apply for <br />ministerial permits through the City, including a demolition permit, landscape permit, <br />grading permit, building permits and occupancy permits. With approval of the zone <br />change and CUP, the proposed project would be consistent with the Santa Ana Municipal <br />Code (SAMC). In addition, the project is located within an area characterized primarily by <br />retail and commercial uses. Therefore, the project would be consistent with the C5 zoning <br />district, would not conflict with the SAMC, and would be consistent with the GC land use <br />designation. <br />The proposed drive -through was designed and intended to generate the least amount of <br />community impacts as possible. An analysis of the site access and site circulation <br />determined that the proposed site plan provides adequate spaces for vehicles to maneuver <br />through the project site and drive -through. In addition, a drive -through evaluation was <br />provided which was intended to determine if the proposed circulation plan provides <br />adequate on -site drive -through storage capacity to accommodate the peak on -site vehicle <br />demands. The analysis determined that the dual drive -through lanes exceed the City's <br />stacking requirements and will allow for a storage capacity of approximately 16 cars, which <br />is sufficient capacity to accommodate average and peak vehicle demands for the <br />proposed project without disrupting drive aisles or on -site parking spaces. <br />As designed, the proposed building will implement many of the current McDonald's <br />restaurant design improvements. McDonald's restaurants are designed to optimize <br />operations, drive -through lane configurations, parking, and on -site circulation. To reduce the <br />vehicle drive -through wait time, McDonald's has developed equipment and procedures to <br />improve cook times and crew efficiency. These improvements include dual order boards (or <br />a side -by -side drive -through) that enables customers to place orders earlier. The side -by - <br />side drive -through allows two cars to stack next to each other which allows the kitchen more <br />cook time to prepare the food to have it ready by the time the customer gets to the pickup <br />window. <br />Since the proposed McDonald's provides a drive -through storage capacity of 16 vehicles, <br />the proposed drive -through lane will accommodate the reference average queue length of <br />5 to 11 vehicles. At no time does the existing or reference peak queue exceed a maximum <br />of 15 vehicles. The drive -through queuing analysis demonstrates that the maximum vehicle <br />queue of 16 vehicles can be accommodated within the drive -through. The site plan provides <br />adequate drive -through storage capacity to serve the average queue length of 5 to 11 <br />vehicles within the drive -through lane. During peak drive -through demands, the site plan <br />can accommodate a total of 16 vehicles within the drive -through. Therefore, peak queuing <br />can be accommodated within the drive -through as designed, and vehicles queuing in the <br />drive -through will have adequate space to queue within the project and will not enter onto <br />East Santa Clara Avenue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.