My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-04-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/16/2024
>
Agenda Packet_2024-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 5:13:35 PM
Creation date
4/10/2024 3:43:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE – <br />ALTERNATIVES ANALYSIS <br />Final <br />The following sections discuss the intersection deficiencies and recommended mitigations for each <br />jurisdiction within the study area. <br />3.7.1 City of Santa Ana <br />There are two location in the City of Santa Ana which require mitigation. Table 3.8 identifies the <br />improvement strategy and corresponding ICUs. The following mitigation is recommended for the intersection <br />that is significantly impacted by the proposed plan update: <br /> <br /> <br />Intersection #719: Flower Street and Segerstrom Avenue <br />This intersection is deficient under the Buildout Cumulative With Update and is forecast to have a <br />significant impact under the Alternative 2 scenario during the PM peak. Because of the high <br />westbound volume on Segerstrom Avenue in the morning, the recommended improvement is to <br />widen the road to add a westbound right-turn lane. The improvement would bring the deficient <br />intersection back to an acceptable LOS. <br />Intersection #720: Flower Street and MacArthur Boulevard <br />This intersection is forecast to have a significant impact under the Alternative 2 scenario during the <br />PM peak. Because of the high eastbound volume on MacArthur Boulevard during the AM Peak hour, <br />the recommended improvement is to widen the road to add an eastbound right-turn lane. The <br />improvement would bring the deficient intersection back to an acceptable LOS. <br />Table 3.8 – City of Santa Ana Intersection Improvements <br />ALTERNATIVE 2 AFTERALTERNATIVE 2 <br />AM PM <br />IMPROVEMENT IMPROVEMENT <br />STRATEGYIDINTERSECTIONAM PM <br />Flower St at <br />Segerstrom Ave <br />Flower St at <br />MacArthur <br />719 <br />720 <br />0.84 <br />0.91 <br />D <br />E <br />1.02 <br />0.88 <br />E 0.84 <br />0.86 <br />D <br />D <br />0.97 <br />0.88 <br />E Add WBR <br />Add EBR <br />1.1% <br />1.0%D D <br />Boulevard <br />*Fair-share percentage is shown for informational and comparison purposes only <br />3.7.2 Freeway Ramps <br />There are 24 freeway ramp which are deficient under the Alternative 2 future scenarios. The volumes are <br />generally consistent with the Buildout With Update scenario forecast volumes, with one ramp experiencing <br />an increase in the peak hour volume of over 30 vehicles per hour, triggering an impact under the impact <br />criteria as agreed to by the City of Irvine and Caltrans. Table 3.9 identifies the one impacted freeway ramp <br />and fair-shares under the Alternative 2 conditions for information and future planning purposes. <br />Table 3.9– Alternative 2 Freeway Ramp Plan Update Impacts and Fair-Share <br />RAMP <br />CAPACITY <br />BUILDOUT CUMULATIVE WITH <br />UDPATE ALTERNTIAVE 2 IMPACT IDENTIFIED <br />AM PEAK HOUR PM PEAK HOUR AM PEAK HOUR PM PEAK HOUR <br />INTERCHANGE <br />I-405 Bristol St NB On-Direct 1 1,000 672 0.45 B 1,386 0.92 E 673 0.45 B 1,430 0.95 E +1 +44 *3.1% <br />Iteris, Inc. | 85 <br /> <br /> <br />City Council 21 – 40 4/16/2024
The URL can be used to link to this page
Your browser does not support the video tag.