My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-04-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
04/16/2024
>
Agenda Packet_2024-04-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 5:13:35 PM
Creation date
4/10/2024 3:43:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/16/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
376
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE – <br />ALTERNATIVES ANALYSIS <br />Final <br />4 COST ESTIMATES <br />4.1 Cost Estimates for Mitigation Improvements <br />Planning level cost estimates were developed for each of the required mitigation locations. This involved the <br />development of concept plans for each of the improvements overlaid on recent aerial imagery provided by <br />the City. Unit costs were updated based on recent Caltrans cost estimates and on bid data provided to the <br />City. These unit costs were then applied to the construction requirements identified in the concept plans. <br />Utility identification, including sewer and overhead electrical lines, were determined to the extent possible <br />from the aerial imagery. Length of turn pocket date was determined from traffic data where appropriate. <br />Consistent with the 2010 Vision Plan Traffic Fee Nexus Study and the 2015 Update, cost estimates include <br />provisions for the following: <br /> <br /> <br /> <br /> <br /> <br /> <br />Preliminary project development <br />Right-of-way <br />Design Engineering and Administration Cost <br />Construction Engineering Cost and Administration <br />Construction Cost <br />Construction Contingency <br />4.1.2 Cost Estimates for Alternative 2 <br />Table 4.2 shows the cost estimates for the improvements identified for the Alternative 2. Concept plans are <br />and detailed cost estimates broken down into component categories are provided in Appendix H. Both <br />intersection improvement locations are unique to Alternative 2. <br />Iteris, Inc. | 87 <br /> <br /> <br />City Council 21 – 42 4/16/2024
The URL can be used to link to this page
Your browser does not support the video tag.