<br />Irvine IBC Traffic Study - Cost Estimate <br />Intersections #719: Flower Street at Segerstrom <br />Mitigations: Add WBR <br />City of Santa Ana <br />ITEM #DESCRIPTION OF WORK UNIT PRICE UNIT QUANTITY COST <br />ROADWAY <br />$15,000.00 <br />$70.00 <br />Clear & Grub <br />Earthwork <br />AC <br />CY <br />LF <br />SQFT <br />LF <br />EA <br />LF <br />SQFT <br />LF <br />SQFT <br />CY <br />0.1 <br />300 <br />326 <br />3,150 <br />70 <br />$1,500 <br />$21,000 <br />$8,150 <br />$25,200 <br />$2,450 <br />$9,000 <br />$1,630 <br />$37,300 <br />$12,600 <br />$26,100 <br />$5,850 <br />Remove Curb & Gutter <br />Remove Concrete Sidewalk <br />Remove/Replace Chain Link Fence <br />Remove & Replace Tree <br />Sawcut <br />Construct AC Pavement <br />Construct Curb & Gutter <br />Construct Concrete Sidewalk <br />Construct Curb Ramp <br />$25.00 <br />$8.00 <br />$35.00 <br />$1,500.00 <br />$5.00 <br />$10.00 <br />$40.00 <br />$10.00 <br />$450.00 <br />6 <br />326 <br />3,730 <br />315 <br />2,610 <br />13 <br />ROADWAY SUBTOTAL $150,780 <br />TRAFFIC <br />Remove Paint Stripe <br />Remove Pavement Marker <br />Relocate Street Light <br />Modify Traffic Signal (per intersection) <br />Install Striping <br />Pavement Marking <br />Loop Detector <br />Relocate Sign (1 post) <br />Railroad Signal, panels and coordination <br />$3.00 <br />$3.00 <br />$6,500.00 <br />$300,000 <br />$5.00 <br />LF <br />EA <br />EA <br />EA <br />LF <br />SQFT <br />EA <br />EA <br />550 <br />2 <br />1 <br />0.25 <br />600 <br />90 <br />1 <br />$1,650 <br />$6 <br />$6,500 <br />$75,000 <br />$3,000 <br />$270 <br />$2,000 <br />$300 <br />$750,000 <br />$838,726 <br />$3.00 <br />$2,000.00 <br />$300.00 <br />$750,000.00 <br />1 <br />1LS <br />TRAFFIC SUBTOTAL <br />UTILITIES AND DRAINAGE <br />Relocate Wood Power Pole <br />Reconstruct Catch Basin <br />Remove Portion Concrete Pier <br />Construct Concrete Pier <br />Remove Portion of Box Culvert <br />Construct Box Culvert <br />Relocate Fire Hydrant <br />Relocate Utility Box/Cabinet <br />Relocate Main Water Pipe <br />$75,000.00 <br />$10,000.00 <br />$1,000.00 <br />$2,000.00 <br />$550.00 <br />$2,000.00 <br />$5,000.00 <br />$1,000.00 <br />$30,000.00 <br />EA <br />EA <br />CY <br />CY <br />CY <br />CY <br />EA <br />EA <br />LS <br />3 <br />2 <br />7 <br />$225,000 <br />$20,000 <br />$7,000 <br />$14,000 <br />$13,200 <br />$80,000 <br />$5,000 <br />$1,000 <br />$30,000 <br />$395,200 <br />7 <br />24 <br />40 <br />1 <br />1 <br />1 <br />UTILITIES AND DRAINAGE SUBTOTAL <br />GENERAL <br />Mobilization <br />Traffic Control <br />Utility Relocations <br />SWPPP Plan and Implementation <br />10% <br />10% <br />5% <br />LS <br />LS <br />LS <br />LS <br />1 <br />1 <br />1 <br />1 <br />$138,500 <br />$138,500 <br />$69,300 <br />6%$83,100 <br />GENERAL SUBTOTAL $429,400 <br />$1,814,200Construction Subtotal <br />RIGHT-OF-WAY <br />Right-Of-Way $80.00 <br />10% <br />$8.00 <br />SQFT <br />LS <br />SQFT <br />4,000 <br />1 <br />1,300 <br />$320,000 <br />$32,000 <br />$10,400 <br />$362,400 <br />Right-Of-Way Support <br />Temporary Construction Easements <br />RIGHT-OF-WAY SUBTOTAL <br />TOTAL CONSTRUCTION & RIGHT-OF-WAY:$2,176,600 <br />Preliminary Project Development (10% Construction Cost, min $300,000) <br />Design Engineering/Administration Cost (15% Construction Cost) <br />Construction Engineering Costs/Administration (15% Construction Cost) <br />Contingency (20% of Construction Cost) <br />$300,000 <br />$272,130 <br />$272,130 <br />$362,840 <br />TOTAL PROJECT COSTS $3,383,700 <br />4/15/2019 <br />  <br />  <br />City Council 21 – 127 4/16/2024