My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/07/2024
>
Agenda Packet_2024-05-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 4:29:48 PM
Creation date
5/2/2024 4:24:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/2/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana RFP No. 24‐009 Page 36 of 63 <br /> <br /> <br />Phase 1: Risk assessment and planning <br />The risk assessment and planning phase will encompass the overall planning stage of the single audit <br />engagement. During this phase, we will work closely with the City’s management to determine that programs <br />and all clusters of programs are properly identified and risk‐rated for determination of the major programs for <br />testing. We will also review the forms and programs utilized in the prior year to determine the extent of any <br />changes which are required. <br />We will accomplish this by following the methodology below: <br /> Determine the threshold to distinguish between Type A and B programs, including the effect of any loans <br />and loan programs <br /> Utilizing the preliminary Schedule of Expenditure of Federal Awards, we will identify the Type A and <br />significant Type B programs (25% of Type A threshold) in accordance with the Uniform Guidance <br /> Identify the programs tested and the findings reported for the past two fiscal years. Determine and <br />document the program risk based on the past two single audits <br /> Prepare and distribute Type B program questionnaires to determine risk associated with Type B programs <br /> Determine the major programs to be tested for the current fiscal year based on the previous steps <br /> Based on our determination of the major programs, we will obtain the current year compliance supplement <br />to aid in the determination of direct and material compliance requirements, and customize the audit <br />program accordingly <br /> Determine the preferred methods of communication during the audit <br /> <br />Phase 2: Major program testing <br />We will determine the programs to be audited based on the risk assessment performed in the planning phase. <br />We will perform the audit of the programs in accordance with UG. <br />To accomplish this, we will perform the following: <br /> Schedule an introductory meeting and notify the City’s management of the major programs for the current <br />fiscal year <br /> Plan and execute the testing of the expenditures reported on the Schedule of Expenditures of Federal <br />Awards <br /> Perform tests of compliance and internal controls over compliance for each major program identified <br /> Schedule periodic progress meetings to determine that schedules are adhered to and identify issues as they <br />arise <br /> Conduct entrance and exit conference meetings with each grant manager <br /> <br />Phase 3: Final assessment and reporting <br />We will re‐perform the steps noted in the preliminary assessment and planning stage once the final Schedule of <br />Expenditures of Federal Awards is received to determine if additional major programs were identified. <br />Based on the final determination of the programs we will perform the following: <br /> Identify Type A and significant Type B programs which were not previously identified <br /> Re‐assess the risk and determine if we are required to audit additional programs <br /> <br /> <br />City Council 21 – 96 5/7/2024
The URL can be used to link to this page
Your browser does not support the video tag.