Laserfiche WebLink
EXHIBIT 3 <br /> CITY OF SANTA ANA <br /> PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> Project Number Project No. 11-6413 SA-5 Vault Modifications Change Order Number 3 <br /> To T.E. Roberts Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included m the plans and <br /> specifications on this contract <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> DESCRIPTION Unit Total <br /> dotal <br /> (Estimate) <br /> Engineered Shoring Puns for Options 1 LS $7,290.00 <br /> Submission & Additional MWD requests & Shoring 1 LS $6,500.00 <br /> Requirements <br /> Additional 45 Degree Bends A €{ B 1 LS $8,174.60 <br /> Additional Fabrication PKr MVVD Change 1 LS $9,320.00 <br /> Abandon Previously Installed Pipeline 1 LS $5,500.00 <br /> Remove & Dispose of Conflicting Concrete 1 LS $31,239,00 <br /> Remove & Dispose of Conflict Vault 1 LS $12,500.00 <br /> Line-Item Adjustments to accommodate balance of <br /> work <br /> 6I=1 Mobilization 1 L5 $15,000.00 <br /> BI=21 Traffic Control 1 LS $3,600.00 <br /> BI=27 Dew'atenrig 1 LS $4,000.00 <br /> Credit for BI= Construct 4" Bottom Drain Blow-off Assembly 1 LS ($221300.00; <br /> TOTAL 48d,823.60 <br /> This is the final cost and full compensation including all labor and materials to complete the <br /> modifications for the SA 5 Vault and Pipeline project. No further compensation will be considered <br /> after this final Change Order. <br /> Page 1 of 2 <br /> City Council 10 — 35 5/21/2024 <br />