Laserfiche WebLink
REBID <br /> CITY OF SANTA ANA <br /> PROPOSAL <br /> : <br /> PROJECT:N 0- 11-6413 <br /> SA-5 VAULT MODIFICATIONS <br /> BID PRQPQ t <br /> TO: CITYCOUNCIL OF THE CffY OF SANTAANA <br /> FROM: T- E <br /> REQUIREMENT, <br /> The, undersigned bidder declares that they have care fully ,examined the location of the proposed <br /> work.,that they have.examinedthe Contract Documents in its entiretyand hereby proposes tDfUrnish <br /> all material and do all the work required to complete tine said work in accordance with said plans, (if <br /> any)and th peclficatjons for the unit pAce(s)or lump sum(s)set forth in the folloviing schedule: <br /> Item! Bid item Unit Qty UnIt Price Amount <br /> 1.* Mobjll2aflon/Demobilizatiion <br /> 2-1 Sheeting,Shoring and LS 1 <br /> Trench Protection <br /> 3. Construct Steel Water Main <br /> (SA-5 Riping) <br /> Construct 3 6-Inch Ductile <br /> 4, tron Pipe,Water Main f)of),— 1.01, <br /> jSouth of SA-5 Vauft) <br /> Construct 16-inch Ductile <br /> 5. Iron Pipe Water Main LS <br /> (North of SA-5 Vault) <br /> Construct Connectlons to <br /> 6. EA 4 ij,pa2 149, 0 <br /> Existirig�12"/IT'Mains <br /> Constru ct Now Flow ControI <br /> 7, <br /> Vau it and Appurtenances <br /> 'S <br /> Construct MocifficaticHis to <br /> 8, the Existing SX5 Meter Is ......... - ----- <br /> vault <br /> 9. construct.Electrical and LS I 1�m 5-06- 160 <br /> Field:Instrumentation <br /> Fumigh tristrumentatIon and <br /> 1t1. ' too <br /> Programming <br /> U Consl ruct 4-Inch fire Seiice EA 1 <br /> P-1 OFP-16 <br /> City Council 23A-10- 14 5/21/2024 <br />