My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Loneroek, Inc. Report No.. 7 0, <br />Project: Warner Avenue improvements Project PCO#: 5.F " I? <br />Project No.: 14-6802; 18-6424; 2M618 Revision: 3/7/2023 <br />Owner: City of Santa Ana Date: 317123 <br />Description of Work: Instal form for top slab of transitional structure, <br />per RFI 24 (Oak Road transitional structure) - <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT` <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />8 <br />$119.42 <br />$162.78 <br />$955.36 <br />Guillermo Saldana (Operator) <br />0 <br />0 <br />$119.42 <br />162.78 <br />$0.00 <br />Ramon Guillen (Foreman Mason) <br />8 <br />- 0 <br />$99.94 <br />$135.07 <br />$799.52 <br />Salvador Saldana (Labor IV) <br />2 <br />0 <br />$92.57 <br />$125,81 <br />$185.14 <br />Ricardo Guillen (Cement Mason} <br />8 <br />0 <br />$93.83 <br />$125.90 <br />$750.64 <br />Raman Guillen Jr. (Mason) <br />8 <br />,. 0 <br />$93.83 <br />$125.90 <br />$750.64 <br />Cruz Benavente Chan (App) <br />3 <br />0 <br />$71.25 <br />$98.67 <br />$213.75 <br />Jesus Gomez (Labor IV) <br />0 <br />0 <br />$92.57 <br />$125.81 <br />1 $0.00 <br />Jorge Alejandres (Labor App IV) <br />8 <br />0 <br />$7-125 <br />$98.67 <br />$57000 <br />s570 <br />" Explain Additional Benefit <br />- <br />SUBTOTAL <br />$4,225.05 <br />MU 20% <br />$845.01 <br />$5,070-06 <br />TOTAL LABOR <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />0 <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />4 <br />$256.50 <br />$1,026.00 <br />CAT 415F Skip Loader <br />4 <br />$47.87 <br />$191.48 <br />CAT 45OF Backhoe Loader <br />0 <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />0.00 <br />CAT 950H Loader <br />0 <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />0 <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0.00 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />4 <br />$37.19 <br />$148.76 <br />Water Truck 36000 LB <br />0 <br />5. 4 <br />CAT 315F <br />0 <br />$61.38 <br />$0.00 <br />Generator <br />8 <br />$7.50 <br />$50.00 <br />* Explain Other Gosta. <br />SUBTOTAL <br />$1,426.24 <br />$213.94 <br />MU 15% <br />TOTAL <br />EQUIPMENT <br />$1,640.18 <br />MATERIAL <br />Description (Attach invoice) <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Sharing <br />day <br />1 <br />385.00 <br />$385.00 <br />Material <br />LS <br />0 <br />233.16 <br />$0.00 <br />Concrete <br />ICY <br />191 <br />165.00 <br />$3,135.00 <br />SUBTOTAL <br />MU 15% <br />TOTAL MATERIAL <br />$3,520.00 <br />$528.00 <br />$4,048,00 <br />OTHER WORD{ <br />Concrete Pump <br />UNITS <br />LS <br />QTY, <br />0 <br />UNIT <br />PRICE <br />$0.00 <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />Exposed soil <br />Load <br />0 1 <br />$300.00 <br />$0.00 <br />' Explain Other Casts: <br />SUBTOTAL <br />$0.00 <br />MU 15% <br />$0.00 <br />T OTAL OTHER WORK <br />- $$oA0 <br />If Above Record is Complete and Correct <br />Contractor's Representative <br />Owner's Representative <br />TOTAL LABOR <br />$5,070.06 <br />TOAL EQUIPMENT <br />$1,640.18 <br />TOTAL MATERIAL <br />$4,048.00 <br />ToalOter <br />$0.00 <br />TOTAL THIS PROPOSAL $10.798.24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.