Laserfiche WebLink
DAILY EXTRA WORK REPORT jO 4 <br />Report No.: <br />Contractor: Lonerock, Inc. PCO#-. <br />Project: Warner Avenue Improvements Project Revision 5/312023 <br />Project No.: 14-6802. 18-6424; 20-6618 Date; 513l23 <br />Owner: City of Santa Ana <br />Description of Work, Additional cost for diging existing trench by hand to insta111"valve <br />Cut previausii installed 12" water pipe, pump water, breaking and remuvincg <br />re oast Mac Donald area <br />anchor block <br />instalI 12 <br />vaive <br />er a c� <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />EXTENDED <br />IR <br />Narne 8. Classification <br />Regular <br />OT <br />Regular <br />OT <br />BENEFIT* <br />AMOUNTS <br />$Q•00 <br />Vililliams {Operator} <br />0 <br />119.42 <br />162.78 <br />$g55.36 <br />rrno Saldana (Operator) <br />8 <br />_ <br />119-42 <br />62,78 <br />$0-00 <br />m Guillen (Foreman Mason) <br />$99.94 <br />$135.07 <br />(40,56 <br />dor Saldana (Labor IV) <br />8 <br />$92 57 <br />$125 81 <br />$0 00 <br />1a Guillen (Cement Mason) <br />$93.83 <br />$125.9Q <br />750.64 <br />fn Guillen Jr. {Mason} <br />8 <br />s <br />$93.83 <br />$125-9Q <br />$98.67 <br />$0 00 <br />Benavente Chan {App} <br />$71.25 <br />$71.25 <br />$98.67 <br />$0-00 <br />Arroyo [App} <br />8 <br />$92-57 <br />1 $125.81 <br />$740-56 <br />Gomez (Labor IV) <br />$71-25 <br />$58.67 <br />$0 0q <br />Alejandres {Labor App IV} <br />0.00 <br />SUBTOTAL <br />$3,187 12 <br />lain Additional Benefit' <br />20% <br />$637 42 <br />— -- -- — - <br />- --- — <br />- — <br />— - - -- <br />- -- <br />_MU <br />TOTAL LABOR <br />$3,824,54 <br />IPMENT <br />58Y <br />OPP- <br />SBY <br />OPP, <br />OTHER <br />COSTS` <br />EXTENDED <br />AMOUNTS <br />ilocrrntinn <br />HRS. <br />HRS- <br />COST <br />COST <br />mn n <br />CAT 45OF Backhoe Loader <br />$83 95 <br />0-Off <br />CAT 450E Backhoe Loader <br />6 $1317 <br />$0-00 <br />CAT 950H Loader <br />$13 <br />206.17 6,74 <br />$D-00 <br />CAT 972H Loader <br />0 <br />25 <br />OAO <br />CAT 262D Skid Steer Loader$40 <br />$38.72 <br />$0.00 <br />CAT CB24B Roller <br />$3fi-28 <br />$D-00 <br />Air Compressor 186 wlbreaker <br />$36-23 <br />$405.12 <br />Dump Truck 2 axle <br />8 <br />$37.19 <br />Crew Truck 20000 LB <br />5. <br />Ater -ruc <br />8 <br />f <br />$61,38 <br />$491,04 <br />CAT 115F <br />$19.84 <br />90 <br />H100 Ham mar <br />SUBTOTAL <br />$991 -90 <br />* Explain Other Costs: <br />---- — — - - - — - <br />- — - - <br />TOTAL EQUIPMENT$1,140-89 <br />UNIT <br />EXTENDED <br />MATERIAL <br />UNITS <br />CITY, <br />PRICE <br />AMOUNTS <br />Description (Attach Invoice) <br />EA7 <br />1 <br />2.449.07 <br />$2,449.0 , <br />12" Valve <br />120,72ff <br />-00 <br />SUBTOTAL.07 <br />MU 15°%-36 <br />TOTAL MATERIAL.43 <br />UNIT <br />OTHER <br />EXTENDED <br />OTHER WORK <br />UNITS <br />CITY, <br />PRICE <br />COSTS* <br />AMOUNTS <br />0 <br />$0-00 <br />0.00 <br />$0.00 <br />5awcut <br />$0-00 <br />SUBTOTAL <br />$0.00 <br />Explain Other Costs: <br />MU 159'0 <br />$Q.qO <br />-- -- ------ - -- — <br />— -- TOTAL TFiER WORD <br />if A ve Record is gamplete and Correct <br />TOTAL LABOR <br />$3,824,54 <br />TOAL EQUIPMENT <br />$1,140,69 <br />TOTALMATERIAL <br />$2,816-43 <br />Co �s �a,a <br />BOMU4% <br />$77.82� <br />; <br />`^"ramP_pwnefs <br />TOTAL THIS PROPQSAL7.82 <br />/ Repre <br />