My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DA IZ Y EXTRA WORK REPORT <br />No.: <br />� � I0 <br />Report <br />contractor. Lonerock, Inc. <br />PCO#: <br />Project: Warner Avenue Improvements <br />Project <br />Revision' <br />5112l2023 <br />Project No-.-14-6$02; 78.5424; 20-6678 <br />pate: <br />5l12I23 <br />Owner: City of Santa Ana <br />Additional cost fo install 2" water <br />services and 12" Valve <br />Description of Work: <br />Paving trench for vane and water services <br />HOLlRS HOURLY RATE ADDITIONAL <br />EXTENDED <br />LABOR <br />Name &Classification <br />Regular DT F2egular <br />OT <br />BENEFIT` <br />AMOUR <br />John Witliams (Operator) <br />0 $119,42 <br />152.78 <br />DO <br />0.00 <br />Guillermo Saldana (0) rator} <br />0 $119.42 <br />$162.78 <br />$0 00 <br />Ramon Guillen (Foreman Mason) <br />$99.94 <br />$135-07 <br />$555 42 <br />Salvador Saldana (tabor IV) <br />6 $92.57 <br />$125.81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125,90 <br />$562 98 <br />Ramon Gu[Ile n Jr. (Mason) <br />6 $71 <br />$125.90 <br />0.00 <br />Cruz Benavente Chan (App) <br />25 <br />$71-25 <br />$98-67 <br />0.06 <br />Peter Arroyo (App) <br />$71-25 <br />6 $92.57 <br />$98.fi7 <br />$125,81 <br />42 <br />$555.0 <br />Jesus Gomez (Labor IV) <br />4 $71-25 <br />$98.67 <br />$280 00 <br />Jorge Alejandres (Labor App IV) <br />$0.00 <br />SUBTOTAL <br />$1,958,82_ <br />Explain Additional Benefit: <br />MU 20% <br />$391,76 <br />- -- - <br />- - - - - - - - <br />- <br />TOTAL_ LABOR <br />$2,350.58 <br />EQUIPMENT <br />SBY Opp.. S6Y <br />DPP. <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />Description <br />HRS. FIRS. COST <br />COST <br />AT 336EL Excavator <br />$187.52 <br />$256.50 <br />$0 00 <br />GAT 345CL Excavator <br />0 <br />$47.87 <br />$0.00 <br />CAT 415F Skip Loader <br />$83.95E]E <br />CAT 450F Backhoe Loader <br />3 <br />.5CAT <br />CAT 450E Backhoe Loader <br />4 <br />$136.17CAT <br />950H Loader <br />$206-74CAT <br />972H Loader <br />0 <br />$40.253232 <br />00 <br />262D Skid Steer Loader <br />$38.72 <br />$232-32 <br />CAT CB24B Roller <br />6 <br />$36.28 <br />$0.00 <br />Air Compressor 185 0breaker <br />$50.64 <br />$303.84 <br />Dump Truck 2 axle <br />6 <br />4 <br />$37.19 <br />$148.76 <br />Crew Truck 20000 LB <br />T47- 4 <br />ater ruc 00 <br />0 <br />0 <br />$61.38 <br />$0,00 <br />CAT 315F <br />$19.84 <br />$0.00 <br />H 100 Hammer <br />SUBTOTAL <br />$1,481.45 <br />i~xpEain Other Costs: <br />�� 5°Io <br />_ <br />$222.72 <br />-- <br />- -- - <br />TOTALEQUIPMENT <br />$1,703.67 <br />EXTENDED <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY. <br />;%75-0; <br />AMOUNTS <br />Ton <br />12 <br />$1,260.00 <br />Asphalt <br />EA <br />2 <br />$150-00 <br />tack cot <br />EA <br />0 <br />0.00 <br />$0.00 <br />SUBTOTAL <br />$1,410.00 <br />MU 15% <br />$211.50 <br />Y.---- aMAT=MlAI <br />4t9 All girl <br />Traffic control <br />Plate <br />' Explain Other Costs: <br />If Ab Record is Complete and Correct <br />A <br />r Contracto reserrtaSive <br />owner's Representative " m <br />Ep, <br />10 <br />$1100 <br />110-00 <br />SUBTOTAL <br />$591.25 <br />MU 15% <br />$88.69 <br />TOTAL OTHER WORK <br />$679,94 <br />TOTAL LABOR <br />$2,350.58 <br />70AL EQUIPMENT <br />$1.703.67 <br />TOTAL MATERIAL <br />$2,301.44 <br />BOND 1% <br />$63.56 <br />TOTAL THIS PROPOSAL <br />6,4191-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.