Laserfiche WebLink
DAILY EXTRA WORT[ REPORT <br />Contractor: Lonerock, Inc. Report No.: .w 3 2.0 <br />Project: Warner Avenue Improvements Project PCO#: 'I <br />Project No.: 14-6902; 18 fi424; 20.6618 Revision: 7/612023 <br />Owner: City of Santa Ana Date: 716f23 <br />Description of Work: Additional cost for installation water service V on Kilson Dr. <br />City requested b - changes on the drawing <br />Installing additional 10' - 8" waterline and water service <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />0 <br />_$_171-974r <br />$162.78 <br />$0.0❑ <br />Gviflermo Saldana (Operator) <br />4 <br />$119A2 <br />$162,78 <br />$477.68 <br />Ramon Guillen (Foreman Mason) <br />0 <br />$99.94 <br />$135.07 <br />$0.00 <br />Salvador Saldana (Labor M <br />❑ <br />$92.57 <br />$125.81 <br />0.00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125.90 <br />0.0 <br />Ramon Guillen Jr. (Mason) <br />0 <br />$93.83 <br />$125.90 <br />$0.00 <br />Cruz Senavente Chan (App) <br />❑ <br />$71.25 <br />$98.67 <br />$0.00 <br />Chris <br />4 <br />$71.25 <br />$98-57 <br />$285-00 <br />Jesus Gomez (Labor Ill) <br />0 <br />$92.57 <br />$125.81 <br />$0-00 <br />Jorge Alejandres (Labor App IV) <br />4 <br />$71.25 <br />$98.67 <br />285.00 <br />$❑A0 <br />" Explain Additional Benefit: <br />SUBTOTAL <br />$1.047-68 <br />MU 20% <br />$209.54 <br />TOTAL LABOR <br />$1,267.22 <br />EQUIPMENT <br />Description <br />SBY <br />HRS_ <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP, <br />COST <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />0 <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />0 <br />$256.50 <br />$0A❑ <br />CAT 415E Skip Loader <br />4 <br />$47.87 <br />1 1-48 <br />CAT 450F Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />0 <br />$136.17 <br />0.00, <br />CAT 972H Loader <br />$206.74 <br />0.00 <br />CAT 262D Skid Steer Loader <br />0 <br />$40.25 <br />$0.00 <br />CAT C824B Ralier <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlinreaker <br />$36.28 <br />$0,05 <br />Dump Truck 2 axle <br />0 <br />$50.64 <br />$0,00 <br />Crew Truck 20000 LB <br />$37.18 <br />$0.00 <br />Water Truck 36000 <br />CAT 315F <br />0 <br />$61.38 <br />$0.00 <br />H100 Hammer $19.84 <br />Explain Other Costs: <br />-- TOTAL <br />SUBTOTAL <br />$0.00 <br />$191.48 <br />MU 15% <br />$28.72 <br />GOU1PMENT <br />$220.20 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />QTY, <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />90 bend with ball curb and meter connection <br />EA <br />0 <br />154.00 <br />$0.00 <br />Sand <br />I <br />_Cy <br />5 <br />31.00 <br />$155.00 <br />CM8 <br />ICY <br />9 <br />23.00 <br />$207.00 <br />Steel Plate 10X6' <br />I <br />I <br />JEA <br />6 <br />10.00 <br />$60.00 <br />copper pipe T' LF <br />1 0 <br />16,00 <br />SUBTOTAL <br />$0.00 <br />$422.00 <br />MU 15°% <br />$63.30 <br />$485.3❑ <br />TOTAL MATERIAL <br />OTHER WORK <br />UNITS <br />QTY_ <br />0 <br />UNIT <br />PRICE <br />$0.00 <br />OTHER <br />COSTS* <br />0.00 <br />EXTENDED <br />AMOUNTS <br />0.00 <br />Explain Other Costs; BTOTAL <br />MU 15% <br />- - - - - -- TOTAL OTHER WORKI <br />$0,00 <br />$0.0❑ <br />$0.00 <br />If Ab ve Record is Gompiete and Correct <br />C Ira Rep se alive <br />Gmer's Representative <br />TOTAL LABOR <br />$1,257.22 <br />TOAL EQWPUENT <br />$220.20 <br />TOTAL AAATERL4L <br />$485.30 <br />BOND 1% <br />$19.63 <br />TOTAL THIS PROPOSAL 1,982.35 <br />