Laserfiche WebLink
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. <br />Project: Warner Avenue improvements Project <br />Project No.: 14-6802-F 18-6424, 20-6618 <br />Owner: City of Santa Ana <br />Description of Work: T&M for changing elevation per RF168 <br />Report No., <br />PCO#: 492 <br />Revision: 911 12023 <br />Date: 9113/23 <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT* <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT - <br />Jahn Wfiliams (Operator) <br />0 <br />$119.42 <br />$162.78 <br />$4.00 <br />Guillermo Saldana (Operator) <br />0 <br />$119,42 <br />$162.78 <br />$0-00 <br />Ramon Guillen (Foreman Mason) <br />1.5 <br />._ <br />$99.94 <br />$135A7 <br />$149A1 <br />Salvador Saldana (Labor IV) <br />0 <br />$92-57 <br />$125.81 <br />$0-00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125-90 <br />$5.55 <br />Ramon Guillen Jr. (Mason) <br />1-5 <br />- <br />$93.83 <br />$125A0 <br />$140.75 <br />Cruz Benavente Chan (App) <br />1.5 <br />- <br />$71-25 <br />$98.67 <br />$106-88 <br />Chris <br />1.5 <br />$71-25 <br />$98-67 <br />$106-88 <br />Manuel <br />0 <br />$92-57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (Labor App IV) <br />1.5 <br />$71-25 <br />$9$.67 <br />$106-88 <br />$0.00 <br />Explain Additional Benefit: <br />SUBTOTAL <br />_ $611.28 <br />$122.26 <br />$733.54 <br />MU 20% <br />TOTAL LABOR <br />EQUIPMENT <br />Description . <br />SBY <br />HRS. <br />OPP. <br />HRS. <br />SBY <br />COST <br />OPP, <br />COST <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187.52 <br />$0.00 <br />CAT 345CL Excavator <br />0 <br />$256-50 <br />$0-00 <br />CAT 415F Skip Loader <br />0 <br />$47.87 <br />$0.00 <br />CAT 450F Backhoe Loader <br />$83-95 <br />$0.00 <br />CAT 456E Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 950H Loader <br />$136.17 <br />$0-00 <br />CAT 972H Loader <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />$40.25 <br />$0.00 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36-28 <br />$0-00 <br />Dump Truck 2 axle <br />$50.64 <br />$0-00 <br />Crew Truck 20000 LB <br />1-5 <br />. <br />$37.19 <br />$55.79 <br />Water Tru-ck 36000 <br />CAT315F 1.5 $61-38 <br />Generator 0 - $19.84 <br />* Explain Other Costs: <br />TOTAL <br />$92-07 <br />SUBTOTAL <br />_ MU 15% <br />EQUIPMENT <br />$0.00 <br />$147.86 <br />$22-18 <br />$170,03 <br />MATERIAL <br />Description (Attach Invoice) <br />UNITS <br />CITY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Traffic Control <br />h <br />2 <br />E8.75 <br />$137-50 <br />30-00 <br />SUBTOTAL <br />TMU 15% <br />$0-00 <br />$437.50 <br />$20.63 <br />TOTAL MATERIAL <br />$156.13 <br />OTHER WORK <br />UNITS <br />UNIT <br />QTY. PRICE <br />OTHER <br />COSTS* <br />EXTENDED <br />AMOUNTS <br />$0.00 <br />$0.00 <br />* Explain Other Costs: SUBTOTAL <br />MU 15°% <br />TOTAL OTHER WORK <br />$0.00 <br />$0.00 <br />$0.00 <br />If Ab e cord is Complete and Correct <br />-rb-ntrgdoes Representative <br />I <br />�.•.f oxmeeP s Repp <br />resentative <br />TOTAL LABOR <br />$733,54 <br />TOAL EQUIPMENT <br />$170,03 <br />TOTAL MATERIAL <br />$158A 3 <br />BOND 1% <br />$10-62 <br />TOTAL THIS PROPOSAL <br />1,072-31 <br />