My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor: Lonerock, Inc. Report No.: �' { <br />Project: Warner Avenue Improvements Project PCOM <br />Project No.: 14-6802; 18.6424; 20-6618 Revision: 10/20023 <br />Owner: City of Santa Ana Date: 10/20/23 <br />Description of Work: T&M for changing elevation per RF160 <br />The City requested to change elevation from CB #10 to Sta 26+00 <br />we excavated CMB +1- 2" from CB#10 to Sta. 26+00 to made adjustment <br />Removed CMB from adjastment of elevation - <br />LABOR <br />Name & Classification <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />BENEFIT' <br />EXTENDED <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams {Operator} <br />0 <br />$119.42 <br />$162-78 <br />$0.00 <br />Guillenno Saldana {Operator} <br />0 <br />$119.42 <br />$162,78 <br />0.00 <br />Ramon Guillen {Foreman Mason} <br />3 <br />$99-94 <br />$135-07 <br />$299.82 <br />Salvador Saldana {Labor IV} <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />3 <br />- <br />$93-83 <br />$125-90 <br />$281.49 <br />Raman Guillen Jr- {Mason} <br />0 <br />$93.83 <br />$125.90 <br />$0.00 <br />Cruz Senavente Chan {App} <br />3 <br />$71-25 <br />$98.67 <br />$213.75 <br />Chris <br />0 <br />$71.25 <br />$98.67 <br />0.00 <br />Manuel <br />0 <br />$92.57 <br />$125.81 <br />$0-00 <br />Jorge Alejandres (Labor App IV) <br />3 <br />$71-25 <br />1 $98-67 <br />213-75 <br />$0-00 <br />* Explain Additional Benefit. <br />-- <br />SUBTOTAL <br />$1,00&81 <br />MU 20% <br />$20116 <br />TOTAL LABOR <br />$1,210.67 <br />EQUIPMENT <br />Description <br />SBY <br />HRS. <br />OPP. <br />HRS- <br />SBY <br />COST <br />OPP. <br />COST <br />OTHER <br />COSTS" <br />EXTENDED <br />AMOUNTS <br />CAT 336EL Excavator <br />$187-52 <br />CAT 345CL Excavator <br />0 <br />$256.50 <br />$0.00 <br />CAT 415F Skip Loader <br />0 <br />$47.87 <br />$0-00 <br />CAT 45OF Backhoe Loader <br />$83.95 <br />$0.00 <br />CAT 450E Backhoe Loader <br />$53.95 <br />$0.00 <br />CAT 950H Loader <br />$136.17 <br />$0.00 <br />CAT 972H Loader <br />$206-74 <br />0.00 <br />CAT 262D Skid Steer Loader <br />3 <br />$40-25 <br />$120.75 <br />CAT CB24B Roller <br />$38.72 <br />$0.00 <br />Air Compressor 185 wlbreaker <br />$36,28 <br />$0.00 <br />Dump Truck 2 axle <br />3 <br />$50.64 <br />151.92 <br />Crew Truck 20000 LB <br />3 <br />$37.19 <br />$111.57 <br />ater Truck36000 L <br />4 <br />CAT 315F <br />0 <br />$61.38 <br />$0-00 <br />Generator 0 $13-64 <br />" Explain Other Costs: <br />TOTAL <br />SUBTOTAL. <br />$0.00 <br />$384-24 <br />MU 15% <br />$57.64 <br />EQUIPMENT <br />$441.88 <br />MATERIAL <br />Description {Attach Invoice} <br />UNITS <br />QTY. <br />UNIT <br />PRICE <br />EXTENDED <br />AMOUNTS <br />Traffic Control <br />h <br />3 <br />68-75 <br />$206-25 <br />30.00 <br />SUBTOTAL <br />--MU 15% <br />$0.00 <br />$246.25 <br />$30.94 <br />TOTAL MATERIAL <br />$237.19 <br />OTHER WORK <br />UNITS <br />OTY, <br />UNIT <br />PRICE <br />OTHER <br />COSTS' <br />EXTENDED <br />AMOUNTS <br />` Explain Other Costs: SUBTOTAL <br />MU 15iIT <br />TOTAL OTHER WORT(!!! <br />1$0.'0 <br />If Above Record is Complete and Correct <br />Co a epresentative <br />f- Ct�' <br />Owner's Representative <br />TOTAL LABOR <br />$1,210-57 <br />TOAL EQUIPMENT <br />$441-88 <br />TOTAL MATERIAL <br />$237-19 <br />BOND 1% <br />$18,90 <br />TOTAL THIS PROPOSAL $1,908-53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.