My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ LONEROCK, INC. <br />California Contractor's License # A - 834112 <br />TO: City of Santa Ana, Public Works Agency M-22 <br />20 Civic Center Plaza, Santa Ana, CA 92701 <br />Project: Warner Ave. Improvements Project No. 14-6802 <br />Date: November 3, 2023 <br />Subject: Cost Estimate for 8" Gate Valve on Orange Ave. Per RFI 52. <br />Attn: Mr. Alexander Olmos <br />Warner Ave. Improvements/ Santa Ana <br />P.O. Box 54503, Irvine, CA 92619 <br />Tel: 949-310-0804 <br />Fax: 949-387-6102 <br />dragan@lonerockinc.com <br />Description I Qty I Rate I Total <br />Warner Ave. Improvements additional cost to install 8" gate valve at Orange Ave. into existing pipe per RFI <br />52. <br />................................................ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 <br />Lump Sum Pricing: <br />a. LABOR $6,000.00 <br />b. EQUIPMENT $3,000.00 <br />c. MATERIAL $4,000.00 <br />GRAND TOTAL: $13,000.00 <br />................................................ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 <br />This proposal requires 3 working days extension. <br />This proposal is predicated on all work being completed during normal working hours. <br />The above quoted amount covers only the presently ascertainable direct costs of the above -referenced changes and <br />does not include unforeseen conditions encountered during construction or delays beyond our control. It excludes <br />costs associated with the impact to these changes upon the project schedule, labor productivity or other factors <br />affecting the cost of performance. Lonerock, Inc. expressly reserves the right to claim any added costs and time <br />extensions caused by this change alone or in conjunction with other changes. We reserve the right to correct this <br />quote for errors or omissions. <br />................................................ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 <br />CLIENT ACCEPTANCE <br />NAME: <br />DATE: <br />SIGNATURE: <br />TITLE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.