My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br />Contractor: Lonerock, Inc. <br />Project: Warner Avenue Improvements Project <br />Project No.: 14-6802; 18.6424; 20-6618 <br />Owner: City of Santa Ana <br />Description of Work: T&M for the soil disposal not belongs to this <br />The City requested to disposed soil between <br />Report No.: 01 <br />PCO#: - <br />Revision: - QA-2 2 23- <br />Date: W4242-3-- I �ZorZ 3 <br />eject <br />vnress street and Allev <br />LABOR <br />HOURS <br />HOURLY RATE <br />ADDITIONAL <br />EXTENDED <br />Name & Classification <br />BENEFIT' <br />AMOUNTS <br />Regular <br />OT <br />Regular <br />OT <br />John Williams (Operator) <br />0 <br />$119.42 <br />$162-78 <br />Guillermo Saldana (Operator) <br />51 <br />$119-42 <br />$162,78 <br />$597,10 <br />Ramon Guillen (Foreman Mason) <br />0 <br />$99-94 <br />$135.07 <br />$0.00 <br />Salvador Saldana (Labor IV) <br />0 <br />$92-57 <br />$125-81 <br />$0.00 <br />Ricardo Guillen (Cement Mason) <br />$93.83 <br />$125.90 <br />$0.00 <br />Raman Guillen Jr. (Mason) <br />0 <br />$93-83 <br />$125.90 <br />$0.00 <br />Cruz Senavente Chan (App) <br />0 <br />$71.25 <br />$98-67 <br />$000 <br />Peter Arroyo (App) <br />$71.25 <br />$98-67 <br />$0-00 <br />Manuel <br />0 <br />$92.57 <br />$125.81 <br />$0.00 <br />Jorge Alejandres (Labor AP IV) <br />0 <br />$71.25 <br />$98.67 <br />$0.00 <br />$0-00 <br />" Explain Additional Benefit: <br />SUBTOTAL <br />$597.10 <br />MU 20%. <br />$119.42 <br />TOTAL LABOR <br />$716.52 <br />EQUIPMENT <br />SBY <br />Opp. <br />SBY <br />OPP. <br />OTHER <br />EXTENDED <br />Description <br />HRS, <br />HRS. <br />COST <br />COST <br />COSTS' <br />AMOUNTS <br />CAT 336EL Excavator <br />187-52 <br />$0.00 <br />CAT 345CL Excavator <br />5 <br />-` <br />5256.50 <br />$1,282-50 <br />CAT 415E Skip Loader <br />0 <br />$47.87 <br />$0-00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0-00 <br />CAT 450E Backhoe Loader <br />$83.95 <br />$0-00 <br />CAT 950H Loader <br />$136-17 1 <br />$0.00 <br />CAT 972H Loader <br />$206.74 <br />$0.00 <br />CAT 262D Skid Steer Loader <br />W-25 <br />$0-00 <br />CAT CB24B Roller <br />$38-72 <br />$0-00 <br />Air Compressor 185 wlbreaker <br />$36.28 <br />$0-00 <br />Dump Truck 2 axle <br />$50.64 <br />$0.00 <br />Crew Truck 20000 LB <br />0 <br />$37-19 <br />$0.00 <br />Water Truck 36 <br />4 - 4 <br />CAT 315F <br />0 <br />1 $61-38 <br />$0.00 <br />Generator o <br />$19.84 <br />$0.00 <br />$1,282.50 <br />Explain Other Costs: <br />SUBTOTAL <br />MU 15% <br />$992.38 <br />EQUIPMENT <br />$1,474.88 <br />TOTAL <br />MATERIAL <br />UNIT <br />EXTENDED <br />Description (Attach Invoice) <br />UNITS OTY. <br />PRICE <br />AMOUNTS <br />Traffic Control <br />h 0 <br />68.75 <br />$0.00 <br />30,00 <br />$0.00 <br />$0.00 <br />SUBTOTAL <br />MU 15% <br />$0.00 <br />TOTAL MATERIAL <br />$0.00 <br />OTHER WORK <br />UNIT <br />OTHER <br />EXTENDED <br />UNITS <br />QTY. <br />PRICE <br />COSTS` <br />AMOUNTS <br />Transport of the soil <br />Load <br />14 <br />$305.00 <br />$4,270.00 <br />$0.00 <br />" Explain Other Costs: SUBTOTAL <br />$4,270.0.0 <br />MU 15% <br />$640.50 <br />TOTAL OTHER WORK <br />54,91o.50 <br />If Above Record is Complete and Correct <br />Contractors Represent <br />f --%-) - ) <br />Owner's Represent We <br />TOTAL LABOR $716.52 <br />TOAL EQUIPMENT $1,474.88 <br />TOTAL MATERIAL and Other $4,910-50 <br />BOND 1% $71.02 <br />TOTAL THIS PROPOSAL $7,172-91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.