Laserfiche WebLink
To: <br />Job Name: <br />Address: <br />THamPSan <br />LOS ANOEL.ES <br />3011 ti Laurel Ave. RIaho. CA 9i777 14[1-W2.0200 i 95%0.22.900 Fax <br />::�•^; r. thnm ltsaft pl pegrntl p.c n m <br />LONEROCK INC. Attn:DRAGAN <br />Project No. 20-6618 Wamer Ave SID Improvements Main St to Oak St <br />City: Santa Ana <br />QUOTATION <br />Page 1 of 2 <br />Quote Number <br />60482 <br />Quote Date: <br />2/1/2021 <br />Date Printed: <br />2/1/2021 <br />Bid Date/Time: <br />Feb 2 2021 12:QOAM <br />100 PM <br />Location: <br />Santa Ana <br />Job ID: <br />20714 <br />We propose to furnish all of the materials andfor services listed herein for this project, subject to KTI. Incorporated, a California Corporation, dba Thompson Pipe Group - Los <br />Angeles TERMS AND CONDITIONS dated 0110112l that shall control and take precedence over any terms and conditions to the contrary in any purchase order or other document. <br />All quantities are approximate, and are not to be considered as a guaranteed Bill of Materials. Prices are quoted without the benefit of plans and specifications. Unit prices will prevail <br />on all actual quantities of materials supplied. All weights are theoretical and may vary. if City of Los Angeles pipe is not quoted as such, a mandatory surcharge will apply.Prices <br />quoted are firm for 30 days past quote date. Thereafter, prices are subject to review. Thompson Pipe Group - Los Angeles does not warranty any type of air lesting of pipe joints. An <br />additional service provider lee will apply for all credit card payments. QUOTE IS BASED ON RECEIVING A FULL ORDER FOR ALL LINE ITEMS QUOTED BELOW. <br />NOTES: QUOTED PER COMBINED PLANS <br />NOTES: east in place box culvert for lateral connection sta 17+37 to sta 17+45 <br />NOTES: 24 RCP LOADS + 150 RCB LOADS = 174 TOTAL LOADS <br />Item Description <br />Additional Information <br />1.00 272.00 FT 18" 2000-D <br />w/ 1.5G SC <br />$18.18 <br />$4,944.96 <br />2.00 64.00 FT 24" 2000-D <br />w/ 1.50 SC <br />$22.61 <br />$1,447,04 <br />3.00 48.00 FT 48" 2000-D <br />w/ Liftholes <br />$82.00 <br />$3,936.00 <br />4.00 400.00 IFT 60" 2000-D <br />wr' Liftholes <br />$113.91 <br />$45,564.00 <br />5,00 112,00 FT 60" 1500-D RG <br />w/ RG <br />$114.01 <br />$12,769.12 <br />6,00 44.OG FT 66" 1500-D RG <br />w/ RG <br />$135.31 <br />$5,953.64 <br />tI�.1S /_ l,agz_�-- <br />See Last Page <br />Con't Next Page <br />See Last Page <br />See Last Page <br />See Last Page <br />Availability: DeIEvery is subject to change, prior to receipt of a signed order, approved plans, and preliminary information. <br />QUOTING TONGUE & GROOVE MORTAR ]DINT STORM DRAIN PIPE, UNLESS NOTED, <br />UNLESS NOTED, PRICES ARE DELIVERED, EXCLUDING ALL APPLICABLE TAXES. <br />ALL MANHOLES AND APPURTENANCES, 4' LONG 6ECVELED PIPE, ALL RUBBER GASKET PIPE, THICKWALL, AS WELL AS ALL PIPE 90" AND LARGER IS REQUIRED <br />TO BE OFF-LOADED BY CUSTOMER <br />UNLESS NOTED, ALL R.G. PIPE IS QUOTED AS STRAIGIiT PIPE WITH POLYISOPRENE RUBBER GASKETS. CUSTOMER TO OFF-LOAD ALL R.G. PIPE <br />Accepted By. <br />For: <br />Date. <br />BRAD OIEN71�r <br />- <br />For Thompson Pipe Group - Los Angeles <br />il�t r <br />Fax: (909) 822-9630 <br />EMail: <br />brad.oiene'?a thompsonpipegroup.com <br />Date: <br />