My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 11 - Approve Additional Funds for the Warner Ave. Street Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2024 2:57:16 PM
Creation date
5/17/2024 10:15:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
718
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Warner Ave Improvements: Phase 1 <br />- Main to Oak <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Warner Avenue between Main Street and <br />Oak Street from 2 to 3 lanes in each direction. The project also <br />includes additional left turn lanes at Main Street, bus turn outs, <br />raised medians, and bike lanes along Warner Avenue between Main <br />Street and Oak Street. <br />PROJECT NEED: <br />The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical <br />Report identified the need for Warner Avenue to be widened to a six - <br />lane major arterial to meet MPAH requirements. The existing Average <br />Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The <br />proposed improvements will allow the segment to accommodate future <br />traffic volumes at a Level of Service A and increase operational <br />efficiency. <br />PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction 800,000 - - - - - - <br />Right -Of -Way - <br />TOTAL 800,000 - - - - - - <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26127 FY 27/28 FY 28129 FY 29/30 <br />DAF: DA-IV - - - - - - - <br />MEASURE M2 COMPETITIVE - <br />RMRA SB1 800,000 <br />TSIA AREA E - <br />TOTAL 800,000 <br />DIVISION: <br />CIP Engineering <br />CONTACT: <br />Jason Gabriel, Principal Civil Engineer <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.