Laserfiche WebLink
Cost Proposal <br /> ADDENDUM 2•EXHIBIT I <br /> ATTACHMENT A•2 <br /> REVISED PROPOSAL PRICING <br /> DISTRICT 1 <br /> PARKS(MUST BE FULLY LOADED AND INCW DE LABOR, Acreage- Monthly Rare Yearly Ralle Full Time <br /> EQUIPMENT, MATERIALS,TRIP CHARGE,DUMPING,ETC.} Equiwlents <br /> Cesar Chavez/Campesino 7 <br /> Edna 2 <br /> El Salvador 9 <br /> King SL Park' Ti <br /> Memory Lane 0,6 <br /> Riverview B <br /> Ros It. S <br /> Other[MUST BE FULLY LOADED AN D INCLUDE LABOR, <br /> EQUIPMENT, MATERIALS,TRIP CHARGE,DUMPING,ETC.} Acreage <br /> 17"St.&Santa Ana River Trangle 0.69 <br /> Fairview Triangle 0.73 <br /> Annual Total rile <br /> -Future Park <br /> DISTRICT 1:SANTA ANA LIBRARY <br /> Centers/Facilities[MUST BE FULLY LOADED AND INCLUDE <br /> LABOR,EQUIPMENT, MATERIALS,TRIP CHARGE, Acreage' Monthly Rate Yearly Rate Full Time <br /> DUMPING,ETC. Equivalents <br /> New Hope Li bray 0.56 <br /> Annual Total n,a <br /> DISTRICT 2 <br /> PARKS(MUST BE FULLY LOADED AND INCLUDE LABOR, Acreage Monthly Rate Yearly Rate Full Time <br /> EQUIPMENT, MATERIALS,TRIP CHARGE,DUMPING,ETC.p Equivalents <br /> loth and Flower Park- 1.7 <br /> Angels Community 1.7 <br /> Birch 2.4 <br /> Cabrillo 7.3 <br /> Cabrillo Tennis Center 7.6 <br /> Cheppa's 0.4 <br /> Eldridge 1.2 <br /> Fisher 1.5 <br /> French 0.2 <br /> Garfield 0.1 <br /> Mabury 5.5 <br /> Mariposa 0.5 <br /> Mam— 5.9 <br /> Ponola 9.1. <br /> Sad d I eback View 0.9 <br /> Santiago[including hike trail) 26 <br /> LABOR,EQUIPMENT, MATERIALS,TRIP CHARGE, AAQeage <br /> 602 N.Garfield Street 0.2 <br /> Centers/Facillties(MU ST B E FULLY LOADED AN D INCLUDE <br /> LABOR,EQUIPMENT, MATERIALS,TRIP CHARGE, Acreage <br /> DUMPING,ETC.f <br /> Garfield Cam m unity Center 0.2 <br /> Plaza Calle Cuatm 0.2 <br /> Sarah Mae Downie Hcvb Garden 0.1 <br /> Santa Ana Stadium 6.9 <br /> Willand Playground 0.2 <br /> nnual Total <br /> Future Pa <br /> DISTRIC72:COMMUNITY DEVELOPMENTAGENC" <br /> Trails and Walkways(MUST BE FULLY LOADED AND <br /> INCLUDE LABOR,EQUIPMENT, MATERIALS,TRIP CHARGE, Linear Miles Monthly Ras, Yearly Rate Full Time <br /> DUMPING,ETC.) Equivalents <br /> 2nd St from Broadway to Sycamore 01 <br /> 41h St,from Ross to French 0.5 <br /> LABOR,EQUIPMENT, MATERIALS,TRIP CHARGE, Acreage Monthly Rate Yearly Rate Full Time <br /> Equivalents <br /> NE comer of 3 rd St.and Bush St. 0.8 <br /> 312 N.Bush Street 0.1 <br /> Annual Total n/a <br /> 17 <br />