Laserfiche WebLink
TABLE OF CONTENTS <br /> SECTION <br /> 1. CONTRACT REQUIREMENTS <br /> 1.1 Independent Contractor <br /> 1.2 Contract Transition <br /> 1.2.1 Transition In <br /> 1.2.2 Transition Out <br /> 1.3 Hours and Days of Maintenance Services <br /> 1.3.1 Scheduling of Operations <br /> 1.3.2 Service Schedules <br /> 1.4 Non-Interference <br /> 1.5 Consumable Materials and Supplies — Contractor-Supplied <br /> 1.6 Consumable Materials and Supplies — City-Supplied <br /> 2. RESPONSIBILITIES OF THE CONTRACTOR <br /> 2.1 Inquiries and Complaints <br /> 2.2 Safety <br /> 2.3 Vehicles and Equipment <br /> 2.4 Locks and Keys <br /> 2.5 Service Yard and Storage Area(s) <br /> 2.6 Utilities <br /> 2.7 Traffic Control <br /> 2.8 Bloodborne Pathogens and Biohazardous Material <br /> 2.9 Accident Reporting and Site Securing <br /> 2.10 Vandalism <br /> 2.11 Cooperation / Collateral Work <br /> 2.12 Protection of Existing Facilities and Structures <br />