My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-06-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Agenda Packet_2024-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2024 5:56:40 PM
Creation date
5/29/2024 5:41:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Santa Ana RFP 24-046 <br />Page A1-6 <br /> <br />(iii) Maintenance Record: <br />The Contractor shall maintain a record log in each location (with or without <br />dedicated cabinet) showing the date and time of any service. It shall consist of: <br />a. Routine Maintenance <br />b. Extraordinary Maintenance <br /> <br />All records shall be legibly written or printed. These record logs shall become <br />property of the City. <br />(c) Flashing Beacons: <br />(i) Maintenance period: <br />The Contractor shall perform a complete inspection and service of each Flashing <br />Beacon once every three (3) months for proper operation and cleanliness. <br />(ii) Tasks: <br /> Cabinets: <br />The cabinets for solar powered flashing beacons are small NEMA cabinet <br />pole mounted at approximately 9’-13’. <br />The Contractor shall clean the cabinets thoroughly on the inside, including all <br />components. The Contractor shall remove all unauthorized external <br />attachments such as notices, posters, signs, etc. and notify the City of any <br />graffiti that is on the signal equipment. It is not the Contractor’s <br />responsibility to remove the graffiti <br /> Battery System: <br />Contractor shall check system operating voltage and battery life. Notify the <br />City if battery needs replacement. <br /> Field Equipment <br />The Contractor shall check all beacons, poles, pedestrian push button and <br />standards. <br />Contractor shall check and notify the City of any missing or damaged traffic <br />signs mounted on the traffic signal poles. <br />Clean the solar panels in accordance to the manufacturer's recommendation. <br /> Maintenance Record <br />The Contractor shall maintain a record log in each controller cabinet showing <br />the date and time of any service. It shall consist of: <br />a. Routine Maintenance <br />b. Extraordinary Maintenance <br /> <br />All records shall be legibly written or printed. These record logs shall <br />become property of the City. <br /> <br /> <br />City Council 31 – 57 6/4/2024
The URL can be used to link to this page
Your browser does not support the video tag.