My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-06-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Agenda Packet_2024-06-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2024 5:56:40 PM
Creation date
5/29/2024 5:41:46 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
142 <br />Continuous Sidewalks, Source: Congress for New Urbanism <br />New Zealand-style Driveway Humps used on Highway 101 in Encinitas, CA <br />K71 Bollards <br />Typology #7: Bus Island Bike Bypass <br />This typology has more similarities with Typologies #1 & #2 than with <br />the other typologies. It is for constrained environments where there is <br />still sufficient space on the sidewalk to have a sidewalk-level bikeway <br />next to ADA-accessible sidewalk space. This typology does not have <br />a floating bus island and there is no on-street parking next to the bike- <br />way. Instead, the bus island is connected to the sidewalk and the bike- <br />way ramps up from street level to sidewalk level and then around the <br />bus island before ramping back down to street level. The bikeway is <br />typically either Class II or Class IV or in rare cases it consists of shared <br />lane markings. This removes the stress of the bicyclist interacting with <br />a bus stopped at the bus stop. Moreover, it also minimizes the interac- <br />tion between people walking and people biking because, in theory, <br />people waiting for the bus will already be on the street-side of the <br />bicycle facility. <br />Engineering Treatment Details <br />Engineering details and photos are shown of continuous sidewalks, <br />New Zealand rubber humps at driveways, K71 bollards, fanned curb <br />ramps, dual curb ramps, and type C curbs. <br />Typology #7: Bus Island Bike Bypass <br /> <br /> <br />City Council 32 – 147 6/4/2024
The URL can be used to link to this page
Your browser does not support the video tag.