|
Appendix D
<br />CCuu rrrreenntt YYeeaarr CCoosstt EE sscc aall aatteedd CCoosstt ((22002288 ))**
<br />77,,2211 00,,000000$$ 88 ,,7777 00,,000000$$
<br />330000,,000000$$ 3377 00,,000000$$
<br />77 ,,55 1100 ,,0000 00$$ 99,,11 4400 ,,0000 00$$
<br />9944 00,,000000$$ 11 ,,115500,,000000$$
<br />11,,332200,,000000$$ 11,,6611 00,,000000$$
<br />11 6600,,000000$$ 220000,,000000$$ CM11,,443300,,000000$$ 11,,77 44 00,,000000$$
<br />33,,885500 ,,0000 00$$ 44 ,,77 0000 ,,0000 00$$
<br />11 11,,4400 00,,00 0000$$ 11 33 ,,8855 00,,00 0000$$
<br />SS aa nn tt aa AA nn aa VV ii ss ii oo nn ZZ ee rr oo
<br />TT uu ss tt ii nn AA vvee ((11 77 tt hh SS tt tt oo FF aa ii rr hhaa vv ee nn AA vvee ))
<br />((CCoo rrrriiddoorr SS aaff eettyy EEnnhhaanncceemmeennttss iinncclluuddiinngg:: MMeeddiiaann IIssllaannddss,, BBiikk ee LLaanneess,, BBiikk ee CCrroo ssssiinnggss,,
<br />CCuurrbb EExxtteennssiioo nnss,, DD iirreeccttiioonnaall CCuurrbb RRaammppss,, SSiiddeewwaallkk EExxtteennssiioo nnss aanndd BBuuss SSttoopp iimmpprroo vveemmeennttss))
<br />SSUUMMMMAA RR YY OOFF PP RR OOJJ EECC TT CC OOSSTT EE SSTTIIMMAA TT EE
<br />TTOOTTAA LL CCOONNSSTTRRUU CC TTIIOONN CC OOSSTT
<br />TTOOTTAA LL RRII GG HHTT OOFF WW AAYY CC OOSSTT
<br />TTOO TT AALL CCAA PPIITTAA LL OO UUTTLLAA YY CCOO SSTTSS
<br />TT OO TT AALL PPRROOJJ EE CCTT CC OO SS TT
<br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were made.
<br />PPSS&&EE ((1177 ..55%%))
<br />RRII GG HHTT OOFF WW AAYY ((22%%))
<br />CCOONNSSTTRRUU CC TTIIOONN ((11 99%%))
<br />TT OOTTAA LL DDEE LL II VVEE RR YY CCOO SSTTDESIGNPPAA//EEDD ((11 22..55%%))
<br />Santa Ana Vision Zero - Top 5 Summary
<br />
<br />
<br />City Council 32 – 193 6/4/2024
|