Laserfiche WebLink
Appendix E <br />1 Install Concrete - Curb Ramp EA 8 8,000$ $64,000 <br />2 Install Concrete - Median Curb CY 34 1,500$ $51,000 <br />3 Install Concrete - Truck Apron Curb CY 13 1,500$ $19,500 <br />4 Install Concrete - Curb and Gutter CY 13 1,080$ $14,040 <br />5 Install Concrete - Sidewalk CY 26 1,040$ $27,040 <br />6 Install Concrete - Textured Pavment CY 23 1,130$ $25,990 <br />7 Install Concrete - Truck Apron CY 10 1,860$ $18,600 <br />8 Roadway Excavation CY 225 260$ $58,500 <br />9 Remove Concrete CY 64 400$ $25,600 <br />10 Hot Mix Asphalt TON 94 345$ $32,430 <br />11 Slurry TON 50 790$ $39,500 <br />12 Base Repair (HMA) ****TON 201 345$ $69,345 <br />13 CL2 Aggregate Base CY 90 180$ $16,200 <br />14 Signing and Striping LS 1 15,900$ $15,900 <br />15 Centerline Hardening EA 4 5,000$ $20,000 <br />16 Rubber Hump EA 4 200$ $800 <br />17 Bus Stop Improvements EA 2 30,000$ $60,000 <br />18 Signal Modification EA 1 $250,000 $250,000 <br />$$880088,,444455 <br />19 Minor Items (15% of Items 1-18) **LS 1 $122,000 $122,000 <br />$$993300,,444455 <br />20 Mobilization (10% of Items 1-19)LS 1 $94,000 $94,000 <br />$$11,,002244,,444455 <br />$358,600 <br />$1,383,045 <br />$$11,,338833,,004455 <br />$$4400,,000000 <br />$$11,,442233,,004455 <br />* <br />**Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />***This feasibility level estimate includes a 35% contingency intended to compensate for the use of preliminary and limited information. <br />****8% of project area is assumed to require Base Repair <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. Utility improvements such as water, <br />communication, gas, etc. are not included in these estimates. <br />SSaannttaa AAnnaa VV iiss iioonn ZZee rroo <br />11 77tt hh SStt aanndd GGrraanndd AAvv ee IInnttee rrssee cctt iioonn <br />((IInntteerrsseeccttiioonn SSaaffeettyy EEnnhhaanncceemmeennttss iinncclluuddiinngg:: PPrrootteecctteedd CCoorrnneerrss,, DDiirreeccttiioonnaall CCuurrbb RRaammppss,, CCeenntteerrlliinnee HHaarrddeenniinngg,, CCllaassss IIIIII BBiikkee RRoouutteess,, BBiikkee <br />CCrroossssiinnggss,, aanndd CCoonnfflliicctt SSttrriippiinngg)) <br />ITEM No.ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL <br />SSUUBBTTOOTTAALL <br />SSUUBBTTOOTTAALL <br />EELLEECCTTRRIICCAALL <br />RROOAADDWWAAYY <br />Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />GGRRAANNDD TTOOTTAALL== <br />RRiigghhtt ooff WWaayy//TTeemmppoorraarryy CCoonnssttrruuccttiioonn EEaasseemmeenntt**== <br />CCOONNSSTTRRUUCCTTIIOONN SSUUBBTTOOTTAALL== <br />GGRRAANNDD TTOOTTAALL <br />CONSTRUCTION SUBTOTAL <br />CONTINGENCY (35%) *** <br />SSUUBBTTOOTTAALL <br />Santa Ana Vision Zero Estimate <br />  <br />  <br />City Council 32 – 215 6/4/2024