My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 40 - Public Hearing Fiscal Year 2024-25 Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 40 - Public Hearing Fiscal Year 2024-25 Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:29:51 PM
Creation date
5/30/2024 3:19:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
40
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1042
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS AGENCY <br />FISCAL YEAR 2024-2025 FEE SCHEDULE <br />SECTION XII <br />ACCOUNT MISCELLANEOUS FEE UNIT ADOPTED PROPOSED DEPARTMENT <br />FY 23-24 FEES IFFY <br />24-25 FEES I CHANGES <br />08617002 51708 <br />10117002 <br />08617002-51709 <br />03517002 50300 <br />04917002 <br />01117002-53746 <br />01117002-53747 <br />08617002-53748 <br />01117002-51704 <br />01117002-51704 <br />01117002-51704 <br />05917002-57080 <br />05917002-57010 <br />CIP Construction Permit Consultant Fee <br />Per CIP CWA Oversight Consultant Proposal Per Project Scope of Work <br />CIP Construction Permit Oversight Fee <br />Harbor Specific Plan <br />Non -Residential - Other Use <br />Non -Residential - Retail/Restaurant <br />Residential - Single Family/Multi-Family <br />Honorary Street Naming Application - Processing Fee <br />Honorary Street Naming Application - Fabrication and Installation <br />Bid Protest Fee <br />Junction Chamber <br />Soiling Sampling <br />Miscellaneous Inspection Fee <br />Developer Contribution - Deposit (Non -Refundable) <br />Based on approved Engineer's estimate <br />Omnibus Concrete - Deposit (Non -Refundable) <br />Based on approved Engineer's estimate <br />Each <br />Each <br />Per 1,000 Sq. Ft <br />Per 1,000 Sq. Ft <br />Per Unit <br />Each <br />Per Sign <br />Each <br />Each <br />Each <br />Each <br />Each <br />Each <br />Actual Cost <br />$2,000 or 10% of CIP <br />Construction Permit <br />Consultant Fee, <br />whichever is greater <br />1,098.14 <br />5,279.40 <br />850.00 <br />648.00 <br />813.00 <br />1,936.00 <br />1,401.00 <br />193.66 <br />193.66 <br />Actual Cost <br />Actual Cost <br />Actual Cost <br />$2,000 or 10%of CIP <br />Construction Permit <br />Consultant Fee, <br />whichever is greater <br />1,098.14 <br />5,279.40 <br />850.00 <br />678.00 <br />851.00 <br />2,026.00 <br />1,466.00 <br />203.00 <br />203.00 <br />Actual Cost <br />Actual Cost <br />Modified Account <br />Modified Account <br />Page 122 of 151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.