My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 40 - Public Hearing Fiscal Year 2024-25 Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 40 - Public Hearing Fiscal Year 2024-25 Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:29:51 PM
Creation date
5/30/2024 3:19:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
40
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1042
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Bristol St Improvements & Widening. - <br />Phase 4 - Warner -St Andrew <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned and designed <br />to incorporate complete street concepts with storm water quality <br />features. The improvements include widening of the street from four <br />lanes to six lanes, with bus turnouts, raised median, bike lanes, <br />enhanced storm drain system, and sound walls. The project also <br />brings native and organic landscaping that beautifies a fully <br />developed urban area. <br />F <br />NEED: <br />rom WarnerAvenue to St. Andrew Place (Phase 4) is <br />'s plan to widen Bristol Street from WarnerAvenue to <br />, which was approved by City Council in 1990 and <br />2015. Existing roadway has only 2 lanes in each <br />direction and is operating at a Level of Service (LOS) F. This widening <br />is needed to improve traffic flow and create complete streets features. <br />PROJECT COSTS <br />FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction <br />680,000 - - - - - - <br />Right -Of -Way <br />288,560 <br />TOTAL <br />968,560 - - - - - - <br />SOURCE OF FUNDS <br />FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />DAF: DA-1 <br />118,250 - - - - - - <br />GENERAL FUND <br />680,000 <br />TSIA AREA F <br />170,310 <br />TOTAL <br />968,560 <br />DIVISION: <br />C/P Engineering <br />CONTACT: <br />Jason Gabriel, Principal Civil Engineer <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.