Laserfiche WebLink
PROJECT TITLE: <br />Civic Center Rehab: Shelton - <br />Flower <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within along <br />Civic Center between Shelton Street and Flower Street. <br />7toweather, <br />NEED: <br />f roadway has been identified as a high priority by the <br />t Management System. The pavement is deteriorating <br />, age, and heavy usage. Some of the adjacent curbs, <br />ay approaches, curb ramps, and sidewalks are also in <br />various states of disrepair and require replacement. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Engineering 1,286,000 - - - - - - <br />TOTAL 1,286,000 - - - - - - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />GENERAL FUND 1,286,000 - - - - - - <br />TOTAL 1,286,000 <br />DIVISION: <br />C/P Engineering <br />CONTACT: <br />Alex Bangean, Senior Civil Engineer <br />21 <br />