My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 40 - Public Hearing Fiscal Year 2024-25 Budget
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 40 - Public Hearing Fiscal Year 2024-25 Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:29:51 PM
Creation date
5/30/2024 3:19:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
40
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1042
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Main St Slurry Seal & Resurfacing: <br />Memory to North City Limit <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Application of slurry seal, crack seal, and minor pavement <br />resurfacing with asphalt concrete. The work also include <br />replacement/installation of missing or damaged curbs, gutters, <br />sidewalk, driveway approaches, wheelchair ramps, and striping. <br />F <br />CT NEED: <br />avement Management Program has been developed to <br />preventative maintenance requirements for the City's street <br />e application of a surface seal to streets with improvements <br />in the last 10 years will ensure a high level of service for <br />e. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction 448,000 - - - - - - <br />TOTAL 448,000 - - - - - - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />M2 LOCAL FAIRSHARE 448,000 - - - - - - <br />TOTAL 448,000 <br />DIVISION: <br />Design Engineering <br />CONTACT: <br />Gilbert Castillo, Senior Engineer <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.