My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-06-04 (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Agenda Packet_2024-06-04 (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 12:09:40 PM
Creation date
6/4/2024 11:52:44 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution Approving the Santa Ana Vision Zero Plan <br />June 4, 2024 <br />Page 2 <br />4 <br />3 <br />0 <br />5 <br />The SAVZ Plan analyzed five years of traffic collision data between 2017 and 2021 to <br />identify collision patterns throughout the city. From the analyzed collision data, corridors <br />and intersections were ranked based on the density and severity of the collisions, <br />proximity to schools, number of street lanes, and equity. The SAVZ Plan identified the <br />top 10 corridors and top 10 intersections in the ranking. <br />Top 10 Corridors in Need of Traffic Safety <br />Enhancements <br />Corridor Ranking <br />Main Street 1 <br />Euclid Avenue 2 <br />1st Street 3 <br />Tustin Avenue 4 <br />Greenville Avenue 5 <br />Grand Avenue 6 <br />Fairview Street 7 <br />Bristol Street 8 <br />4th Street 9 <br />17th Street 10 <br />Top 10 Intersections in Need of Traffic Safety <br />Enhancements <br />Intersection Ranking <br />Harbor Boulevard at 1st Street 1 <br />17th Street at Grand Avenue 2 <br />Harbor Boulevard at McFadden Avenue 3 <br />1st Street at Flower Street 4 <br />Edinger Avenue at Maple Street 5 <br />Segerstrom Avenue at Bear Street 6 <br />Flower Street at Macarthur Boulevard 7 <br />Macarthur Boulevard at Raitt Street 8 <br />Dyer Road at Flower Street 9 <br />Flower Street at Alton Avenue 10 <br />The plan then assessed the factors associated with each collision along the identified <br />corridor and provided specific safety improvement recommendations to address the <br />types of collisions that occurred within those corridors. Additionally, cost estimates for <br />the recommended improvements of each project corridor were developed. These plans <br />and cost estimates will aid the City in pursuing future grant funding opportunities and to <br />facilitate implementation of safety features. Staff recommends the approval of this <br />resolution (Exhibit 2) in order to continue to pursue grant funding followed by the <br />implementation of the safety improvements presented in the SAVZ Plan. <br /> <br /> <br />City Council 32 – 2 6/4/2024
The URL can be used to link to this page
Your browser does not support the video tag.