My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 33 - Measure M2 Funding Eligibility 2024 Renewal (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 33 - Measure M2 Funding Eligibility 2024 Renewal (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 12:16:53 PM
Creation date
6/4/2024 12:11:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
33
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />May 27, 2024 <br /> <br /> <br />Mr. David Ramirez <br />CITY OF SANTA ANA <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br /> <br />Subject: City of Santa Ana – OCTA Pavement Management Compliance Report 2024 <br /> <br />Dear David: <br /> <br />As part of the 2024 Update of the Pavement Management Plan (PMP) for the City of Santa Ana, Bucknam <br />Infrastructure Group, Inc. is pleased to submit the PMP reporting required by the Orange County <br />Transportation Authority (OCTA). This data/report will be submitted to OCTA as part of the City’s required <br />biennial PMP prior to June 30, 2024. <br /> <br />The information contained in this report was used to develop the recommended improvement program for <br />the pavement network. The report covers the following categories: <br /> <br />• Pavement Management Plan Certification <br /> <br />• Quality Assurance / Quality Control (QA/QC) Plan <br /> <br />• Pavement Management Data Files (Included within the online Santa Ana StreetSaver batch file) <br /> <br />• Pavement Management Plan that includes the following: <br /> <br />• Average Pavement Conditions For Each Segment in the Network (PCI Report) <br /> The Pavement Condition Index report shows the present condition of each street in <br />the pavement network (MPAH and Locals). In addition, the report shows the basic <br />geometry of each street segment. <br /> <br />• Seven-year Projected PCI Under Existing Funding Levels <br /> This report identifies the projected PCI’s based on the local agencies current funding <br />programs. This report details the PCI projects for the entire network, MPAH roadways <br />and Local streets. <br /> <br />• Seven-year Plan for Road Maintenance and Rehabilitation (Forecasted Maintenance <br />Report) <br /> The Forecasted Maintenance Report projects the street maintenance activities <br />required for the next seven years, broken down to show maintenance levels for all <br />streets. This includes all scheduled projects provided by the City for fiscal years 2024 <br />through 2031.
The URL can be used to link to this page
Your browser does not support the video tag.