<br />TIP ID CP-12291 IMPLEMENTING AGENCY Santa Ana, City of
<br />Local Project Number:
<br />Additional Project IDs:
<br />Type of Work: Road Maintenance
<br />Project Title
<br />Bridge Preventative Maintenance (BPMP)
<br />Project Description
<br />Type of Work Description: Road Maintenance - Eight (8) bridges are eligible for preventative maintenance work under the Bridge PreventativeBridgeMaintenance Program (BPMP) guidelines.
<br />Limits FISCAL TOꢀL
<br />ROW CON/IMP O&M TOꢀL ꢁꢂ
<br />ED
<br />FUND TYPE ENG
<br />$30,000 $0
<br />YEARCitywide Measure M2 Local
<br />FairshareProject Notes
<br />FY24-25 CIP
<br />2025 $0 $0 $30,000 $30,000
<br />Totals: $30,000 $0 $0 $0 $30,000 $30,000
<br />Last Revised: 24-00 - In Progress Total Programmed: $30,000
<br />IMPLEMENTING AGENCY Santa Ana, City ofTIP ID CP-12290
<br />Local Project Number:
<br />Additional Project IDs:
<br />Type of Work: Road Widening
<br />Project Title
<br />Bristol St. and Memory Ln. Intersection Widening
<br />Project Description
<br />The proposed improvements would involve the widening of Bristol Street just north of Memory Lane to
<br />accommodate an additional through southbound lane. Additionally, the proposed improvements wouldinclude the construction of sidewalk, curb and gutter
<br />Type of Work Description: Road Widening - Add
<br />1 lane to existing roadway in project limits
<br />Limits FISCAL
<br />YEAR
<br />TOꢀL
<br />ROW CON/IMP O&M TOꢀL ꢁꢂ
<br />ED
<br />FUND TYPEBristol Street north of Memory Lane Measure M2 Local
<br />FairshareProject Notes 2025 $80,000 $0 $0 $0 $80,000 $80,000
<br />FY24-25 CIP, carry forward FY23-24 amount foractive project expenditures.
<br />Totals: $80,000 $0 $0 $0 $80,000 $80,000
<br />Last Revised: 24-00 - In Progress Total Programmed: $80,000
<br />IMPLEMENTING AGENCY Santa Ana, City ofTIP ID CP-11808
<br />Local Project Number: 20-SNTA-ACE-3968
<br />Additional Project IDs:
<br />Type of Work: Road Widening
<br />Project Title
<br />Bristol Street Improvements Phase 3A - Civic Center Drive to Washington Avenue
<br />Project Description
<br />Bristol Street from Civic Center Dr to Washington Ave would be widened to a total of six lanes (three
<br />lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation Elementand the County of Orange MꢃH.
<br />Type of Work Description: Road Widening - Add
<br />2 lanes to existing roadway in project limits
<br />Limits FISCAL
<br />YEAR
<br />TOꢀL
<br />ꢁꢂ
<br />ED
<br />FUND TYPE ENG ROW CON/IMP O&M TOꢀLCivic Center Drive to Washington Avenue Measure M2 Local
<br />FairshareProject Notes
<br />FY24-25 CIP; carrꢀoꢁard FY23-24 amount for
<br />active project expenditures.
<br />2025 $0 $0 $5,240,293 $0 $5,240,293 $5,397,502
<br />Totals: $0 $0 $5,240,293 $0 $5,240,293 $5,397,502
<br />Last Revised: 24-00 - In Progress Total Programmed: $5,240,293
<br />TIP ID CP-11807 IMPLEMENTING AGENCY Santa Ana, City of
<br />Local Project Number: 20-SNTA-ACE-3969
<br />Additional Project IDs: 20-SNTA-ACE-3969
<br />Type of Work: Road Widening
<br />Project Title
<br />Bristol Street Improvements Phase 4 - Warner Avenue to St. Andrew Place
<br />Project Description
<br />Bristol Street from Warner Ave to St. Andrew Pl would be widened to a total of six lanes (three lanes in
<br />each direction) to be consistent with the City of Santa Ana General Plan Circulation Element and theCounty of Orange MPAH.
<br />Type of Work Description: Road Widening - Add
<br />2 lanes to existing roadway in project limits
<br />Limits FISCAL
<br />YEAR
<br />TOTALFUND TYPE ENG ROW CON/IMP O&M TOꢀL ꢃLꢄꢅEDWarner Avenue to St. Andrew Place Measure M2 Local
<br />FairshareProject Notes
<br />FY24-25 CIP; carrꢀorꢂard FY23-24 amount for
<br />active project expenditures.
<br />2025 $0 $0 $11,910,066 $0 $11,910,066 $12,267,368
<br />Totals: $0 $0 $11,910,066 $0 $11,910,066 $12,267,368
<br />Last Revised: 24-00 - In Progress Total Programmed: $11,910,066
<br />85
|