Laserfiche WebLink
<br />TIP ID CP-12291 IMPLEMENTING AGENCY Santa Ana, City of <br />Local Project Number: <br />Additional Project IDs: <br />Type of Work: Road Maintenance <br />Project Title <br />Bridge Preventative Maintenance (BPMP) <br />Project Description <br />Type of Work Description: Road Maintenance - Eight (8) bridges are eligible for preventative maintenance work under the Bridge PreventativeBridgeMaintenance Program (BPMP) guidelines. <br />Limits FISCAL TOꢀL <br />ROW CON/IMP O&M TOꢀL ꢁꢂ <br />ED <br />FUND TYPE ENG <br />$30,000 $0 <br />YEARCitywide Measure M2 Local <br />FairshareProject Notes <br />FY24-25 CIP <br />2025 $0 $0 $30,000 $30,000 <br />Totals: $30,000 $0 $0 $0 $30,000 $30,000 <br />Last Revised: 24-00 - In Progress Total Programmed: $30,000 <br />IMPLEMENTING AGENCY Santa Ana, City ofTIP ID CP-12290 <br />Local Project Number: <br />Additional Project IDs: <br />Type of Work: Road Widening <br />Project Title <br />Bristol St. and Memory Ln. Intersection Widening <br />Project Description <br />The proposed improvements would involve the widening of Bristol Street just north of Memory Lane to <br />accommodate an additional through southbound lane. Additionally, the proposed improvements wouldinclude the construction of sidewalk, curb and gutter <br />Type of Work Description: Road Widening - Add <br />1 lane to existing roadway in project limits <br />Limits FISCAL <br />YEAR <br />TOꢀL <br />ROW CON/IMP O&M TOꢀL ꢁꢂ <br />ED <br />FUND TYPEBristol Street north of Memory Lane Measure M2 Local <br />FairshareProject Notes 2025 $80,000 $0 $0 $0 $80,000 $80,000 <br />FY24-25 CIP, carry forward FY23-24 amount foractive project expenditures. <br />Totals: $80,000 $0 $0 $0 $80,000 $80,000 <br />Last Revised: 24-00 - In Progress Total Programmed: $80,000 <br />IMPLEMENTING AGENCY Santa Ana, City ofTIP ID CP-11808 <br />Local Project Number: 20-SNTA-ACE-3968 <br />Additional Project IDs: <br />Type of Work: Road Widening <br />Project Title <br />Bristol Street Improvements Phase 3A - Civic Center Drive to Washington Avenue <br />Project Description <br />Bristol Street from Civic Center Dr to Washington Ave would be widened to a total of six lanes (three <br />lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation Elementand the County of Orange MꢃH. <br />Type of Work Description: Road Widening - Add <br />2 lanes to existing roadway in project limits <br />Limits FISCAL <br />YEAR <br />TOꢀL <br />ꢁꢂ <br />ED <br />FUND TYPE ENG ROW CON/IMP O&M TOꢀLCivic Center Drive to Washington Avenue Measure M2 Local <br />FairshareProject Notes <br />FY24-25 CIP; carrꢀoꢁard FY23-24 amount for <br />active project expenditures. <br />2025 $0 $0 $5,240,293 $0 $5,240,293 $5,397,502 <br />Totals: $0 $0 $5,240,293 $0 $5,240,293 $5,397,502 <br />Last Revised: 24-00 - In Progress Total Programmed: $5,240,293 <br />TIP ID CP-11807 IMPLEMENTING AGENCY Santa Ana, City of <br />Local Project Number: 20-SNTA-ACE-3969 <br />Additional Project IDs: 20-SNTA-ACE-3969 <br />Type of Work: Road Widening <br />Project Title <br />Bristol Street Improvements Phase 4 - Warner Avenue to St. Andrew Place <br />Project Description <br />Bristol Street from Warner Ave to St. Andrew Pl would be widened to a total of six lanes (three lanes in <br />each direction) to be consistent with the City of Santa Ana General Plan Circulation Element and theCounty of Orange MPAH. <br />Type of Work Description: Road Widening - Add <br />2 lanes to existing roadway in project limits <br />Limits FISCAL <br />YEAR <br />TOTALFUND TYPE ENG ROW CON/IMP O&M TOꢀL ꢃLꢄꢅEDWarner Avenue to St. Andrew Place Measure M2 Local <br />FairshareProject Notes <br />FY24-25 CIP; carrꢀorꢂard FY23-24 amount for <br />active project expenditures. <br />2025 $0 $0 $11,910,066 $0 $11,910,066 $12,267,368 <br />Totals: $0 $0 $11,910,066 $0 $11,910,066 $12,267,368 <br />Last Revised: 24-00 - In Progress Total Programmed: $11,910,066 <br />85