|
<br />TIP ID CP-11186 IMPLEMENTING ꢁGENCY Santa ꢀna, City of
<br />Local Project Number: N/A
<br />ꢁdditional Project IDs:
<br />Project Title
<br />Local Street Preventative Maintenance
<br />Type of Work: Road Maintenance Project Description
<br />Type of Work Description: Road Maintenance -This project provides for the application of crack seal and slurry seal to various streets City wide.Slurry seal of roadway
<br />Limits
<br />City wide
<br />Project Notes
<br />Total project budget increased from $18,000,000 to
<br />$24,500,000. FY24-25 CIP
<br />FISCꢁL
<br />YEꢁR
<br />TOꢀLFUND TYPE ENG ROW CON/IMP O&M TOTꢁL ESCꢁLꢂED
<br />Measure M2 Local
<br />FaIrshare2025
<br />2026
<br />2027
<br />2028
<br />2029
<br />2030
<br />2031
<br />$150'000 $0
<br />$150•000 $0
<br />$150'000 $0
<br />$150'000 $0
<br />$150•000 $0
<br />$150 000 $0
<br />$150'000 $0
<br />$3,350,000 $0
<br />$3,350,000 $0
<br />$3,350,000 $0
<br />$3,350,000 $0
<br />$3,350,000 $0
<br />$3,350,000 $0
<br />$3,350,000 $0
<br />$3,500,000 $3,600,500
<br />$3,500,000 $3,704,015
<br />$3,500,000 $3,810,635
<br />$3,500,000 $3,920,455
<br />$3,500,000 $4,033,568
<br />$3,500,000 $4,150,075
<br />$3,500,000 $4,270,077
<br />M�asure M2 LocalFairshare
<br />Measure M2 Local
<br />FaIrshare
<br />M�asure M2 LocalFaIrshare
<br />Measure M2 Local
<br />Fa1rshare
<br />M�asure M2 LocalFa1rshare
<br />Measure M2 Local
<br />FaIrshare
<br />Totals: $1,050,000 $0 $23,450,000 $0 $24,500,000 $27,489,325
<br />Last Revised: 24-00 - In Progress Total Programmed: $24,500,000
<br />TIP ID CP-12323 IMPLEMENTING ꢁGENCY Santa ꢀna, City of
<br />Local Project Number:Project Title
<br />ꢁdditional Project IDs:Macꢀrthur Boulevard Corridor Signal Synchronization
<br />Type of Work: Traffic Signals
<br />Type of Work Description: Traffic Signals -
<br />Project Description
<br />MacArthur Boulevard Traffic Signal Synchronization project will coordinate the Traffic Signals alongInterconnect traffic signals to improve coordination this corridor between three agencies. Designated as part of a Signal Synchronization Network Corridorand communications by the Traffic Signal Synchronization Master Pl
<br />Limits FISCꢁL TOꢀLFUND TYPE ENG ROW CON/IMP O&M TOꢀLYEꢁR ꢃLꢄꢅEDMacArthur Boulevard from Walmart Shopping
<br />Center Entrance to Macꢀꢁhur Place
<br />Project Notes
<br />Measure M2 Local
<br />Fairshare2025 $0 $0 $100,000 $0 $100,000 $103,000
<br />FY24-25 CIP - Currently Under Construction.
<br />Totals: $0 $0 $100,000 $0 $100,000 $103,000
<br />Last Revised: 24-00 - In Progress Total Programmed: $100,000
<br />TIP ID CP-12347 IMPLEMENTING ꢁGENCY Santa ꢀna, City of
<br />Local Project Number:
<br />ꢁdditional Project IDs:
<br />Type of Work: Road Maintenance
<br />Project Title
<br />Main St Slurry Seal & Resurfacing: Memory Lane to North City Limit
<br />Project Description
<br />ꢀpplication of slurry seal, crack seal, and minor pavement resurfacing with asphalt concrete. The work
<br />also include replacement/installation of missing or damaged curbs, gutters, sidewalk, drivewayapproaches, wheelchair ramps, and striping.
<br />Type of Work Description: Road Maintenance -
<br />Rehabilitation of roadway
<br />Limits FISCꢁL
<br />YEꢁR
<br />TOꢀLFUND TYPE ENG ROW CON/IMP O&M TOꢀL ꢃLꢄꢅEDMemory Lane to North City Limit
<br />Project Notes
<br />FY24-25 CIP
<br />Measure M2 Local
<br />Fairshare2025 $0 $0 $448,000 $0 $448,000 $461,440
<br />Totals: $0 $0 $448,000 $0 $448,000 $461,440
<br />Last Revised: 24-00 - In Progress Total Programmed: $448,000
<br />89
|