Laserfiche WebLink
ACCOUNT UNIT ADOPTED <br />FY 23-24 FEES <br />PROPOSED <br />FY 24-25 FEES <br />DEPARTMENT <br />CHANGES <br />PLANNING & BUILDING AGENCY <br />FISCAL YEAR 2024-2025 FEE SCHEDULE <br />SECTION X <br />MISCELLANEOUS FEE <br />New or Total Rewire for Single Family Dwellings: <br />51603 199)SFD (per square foot)sq. ft.0.18 0.19 <br />51603 200)Garage (per square foot)sq. ft.0.18 0.19 <br />51603 201)Temporary Electrical Service, Prior to approval or Each Meter 283.33 296.53 <br />Occupancy (30 Days) <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000 cash or cashier's check conforming to the <br /> Santa Ana Municipal Code Section 8-1768 for each service <br />meter. This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br />Mechanical Fees <br />51604 202)Permit Issuance Fee 63.90 66.88 <br />51604 203)Minimum Fee (Nonresidential)85.19 89.16 <br />53603 204)Stand Alone Mechanical Plan Check 65% of Subtotal 65% of Subtotal <br />Furnace including ducts & vents (each) <br />51604 205)Up to 100,000 BTU 76.13 79.68 <br />51604 206)Over 100,000 BTU 108.63 113.69 <br />51604 207)Furnace/Compressor Combo (Residential)147.29 154.15 <br />Page 79 of 151