My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 40 - Public Hearing Fiscal Year 2024-25 Budget (Revised)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 40 - Public Hearing Fiscal Year 2024-25 Budget (Revised)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2024 12:22:10 PM
Creation date
6/4/2024 12:17:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
40
Date
6/4/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1042
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE: <br />Bristol St & Memory Ln Intersection <br />Widening <br />PROJECT DESCRIPTION:PROJECT NEED: <br />The proposed improvements would involve the widening of Bristol <br />Street just north of Memory Lane to accommodate an additional <br />through southbound lane. Additionally, the proposed improvements <br />would include the construction of sidewalk, curb and gutter, <br />pavement, signal modification, and curb ramps. <br />Bristol Street north of Memory Lane has three southbound lanes except <br />at the intersection where only two southbound and one right turn lane <br />exist. An additional southbound through lane is needed to complete the <br />City's plan to widen Bristol Street from Warner Avenue to Memory Lane <br />on the north, which was approved by City Council in 1990 and re- <br />evaluated in 2001.PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />PROJECT COSTS FY 24/25 <br />80,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Engineering ------ <br />TOTAL 80,000 ------ <br />SOURCE OF FUNDS FY 24/25 <br />80,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />M2 LOCAL FAIRSHARE TSIA ------ <br />TOTAL 80,000 ------ <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Jason Gabriel, Principal Civil Engineer <br />18
The URL can be used to link to this page
Your browser does not support the video tag.