Laserfiche WebLink
<br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE: <br />Civic Center Rehab: Shelton - <br />Flower <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within along <br />Civic Center between Shelton Street and Flower Street. <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating <br />due to weather, age, and heavy usage. Some of the adjacent curbs, <br />gutters, driveway approaches, curb ramps, and sidewalks are also in <br />various states of disrepair and require replacement.PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />PROJECT COSTS FY 24/25 <br />1,286,000 <br />1,286,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Engineering ------ <br />TOTAL ------ <br />SOURCE OF FUNDS FY 24/25 <br />1,286,000 <br />1,286,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />GENERAL FUND ------ <br />TOTAL ------ <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Alex Bangean, Senior Civil Engineer <br />21