Laserfiche WebLink
<br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Main St Slurry Seal & Resurfacing: <br />Memory to North City Limit <br />Application of slurry seal, crack seal, and minor pavement <br />resurfacing with asphalt concrete. The work also include <br />replacement/installation of missing or damaged curbs, gutters, <br />sidewalk, driveway approaches, wheelchair ramps, and striping. <br />The City's Pavement Management Program has been developed to <br />identify the preventative maintenance requirements for the City's street <br />network. The application of a surface seal to streets with improvements <br />constructed in the last 10 years will ensure a high level of service for <br />years to come.PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />PROJECT COSTS FY 24/25 <br />448,000 <br />448,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction ------ <br />TOTAL ------ <br />SOURCE OF FUNDS FY 24/25 <br />448,000 <br />448,000 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />M2 LOCAL FAIRSHARE ------ <br />TOTAL ------ <br />AGENCY:DIVISION:CONTACT: <br />Public Works Design Engineering Gilbert Castillo, Senior Engineer <br />26