<br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />Warner Ave Improvements: Phase 2 <br />- Oak to Grand <br />This project will widen Warner Avenue between Oak Street and <br />Grand Avenue from 2 to 3 lanes in each direction. The project will <br />also include additional left turn lanes at Grand Avenue, bus pads, <br />raised medians, and a protected bike lane. <br />The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical <br />Report identified the need for Warner Avenue to be widened to a six- <br />lane major arterial to meet MPAH requirements. The existing Average <br />Daily Traffic (ADT) is in excess of 29,600 vehicles per day. The <br />proposed improvements will allow the segment to accommodate future <br />traffic volumes at a Level of Service A and increase operational <br />efficiency. <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />PROJECT COSTS FY 24/25 <br />242,030 <br />242,030 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />Construction ------ <br />TOTAL ------ <br />SOURCE OF FUNDS FY 24/25 <br />242,030 <br />242,030 <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 <br />TSIA AREA E ------ <br />TOTAL ------ <br />AGENCY:DIVISION:CONTACT: <br />Public Works CIP Engineering Alex Bangean, Senior Civil Engineer <br />32