Laserfiche WebLink
TSCM CORPORATION <br />An Environmentally Sensitive Service Corporation <br />17791 Jamestown Lane <br />Huntington Beach, CA 92647 <br />714.841.1988 <br />714.841.3222 tax <br />www.tscmcorp.com <br />Contractors License # 934760 <br />SCOPE OF SERVICES & SCHEDULE <br />A. Power Sweeping <br />1. Contractor shall supply all labor, materials, equipment, and transportation necessary for the <br />removal of trash, dust, and debris from parking lots, vehicular entryways, bus parking stalls, and all <br />four levels of parking structure as indicated on the attached map (Exhibit A) of the Santa Ana <br />Regional Transportation Center (SARTC). <br />2. Contactor is required to sweep all designated areas following frequencies on attached sheet. All <br />work at the SARTC to be done between the hours of 11 pm and 4am. <br />3. Contractor must leave the area clean and free of all trash, dust and debris. The Contractor must <br />remove all of the trash dust and debris from the facility. The sweeping process must not damage <br />any surfaces. The sweeping process must not damage adjacent areas in any way. The contractor <br />will be responsible for all damage to the surrounding areas. <br />4. The contractor, upon completion of the job and prior to final acceptance, shall remove all supplies, <br />materials, debris, rubbish, etc., caused by the operation and leave the finished site in a neat, orderly <br />condition. <br />5. Sweeping must include area under and around vehicles parked in lots or in parking structure; in or <br />around all corners and recesses and other structures located within the sweeping area. <br />6. All curbs adjacent to the SARTC property must be swept, removing all dirt and grime. <br />7. The Contractor will be responsible for the disposal of all waste. <br />B. Power Washing <br />1. Contractor shall supply all labor, materials, equipment, and transportation necessary for the <br />removal of stains and deposits from cement and brick paver sidewalks as indicated on the attached <br />site plan (Exhibit A) of the SARTC. <br />2. All work at the SARTC shall be performed seven days a week between the hours of 11pm and <br />4am. <br />3. The areas are described on the next page <br />