Laserfiche WebLink
ACCOUNT <br />51606 <br />51606 <br />51606 <br />51606 <br />51611 <br />PLANNING &BUILDING AGENCY <br />FISCAL YEAR 2024-2025 FEE SCHEDULE <br />SECTION X <br />MISCELLANEOUS FEE <br />2) In addition to the above noted permit fees, <br />a fee shall be collected for new site improvements, <br />new parking lots, new concrete curb and gutter, and <br />asphalt paving. <br />3) Inspections outside of normal business hours <br />(4 hour minimum charge for Holidays, Saturday <br />or Sunday inspections). <br />4) Re -inspection fee assessed under applicable <br />provisions of the Building Code. <br />5) Inspections for which no fee is specifically <br />indicated (minimum charge - one (1) hour) <br />SOLAR ENERGY CODE <br />Any person desiring a permit required by the Solar Energy <br />Code shall, at the time of filing, pay an application, fee of <br />$53.69. There is no minimum fee for the issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be $87.76. <br />UNIT ADOPTED PROPOSED DEPARTMENT <br />FY 23-24 FEES FY 24-25 FEES CHANGES <br />Minimum Sq. Ft. <br />Per Hour <br />Per Hour <br />Per Hour <br />Each Permit <br />0.05 <br />112.33 <br />112.33 <br />112.33 <br />53.69 <br />87.76 <br />0.05 <br />117.56 <br />117.56 <br />117.56 <br />56.19 <br />91.85 <br />Page 93 of 151 <br />