Laserfiche WebLink
Accelerated Plan Check Initial (Streets, Utilities, Maps, etc.) Fee <br />Each Actual Cost <br />This is the initial cost of accelerated plan check hours in staff processing time. Costs can vary. The initial plan check fee can range from <br />double, quintuple, to ten times the accelerated plan check for public improvements fee. <br />S. Traffic Occupancy or Lane Closure Requiring Signage <br />Existing Fee: <br />All Streets Per Day $378.00 <br />Minor Streets Deposit $1,195.00 <br />Major Streets Deposit $1,,592.00 <br />Proaosed Fee: <br />All Streets Per Day <br />$396.00 <br />3-5 days <br />$1,188.00 <br />2 week period <br />$1,.584.00 <br />3 week period <br />$1,980.00 <br />4 week period <br />$2,376.00 <br />Minor Streets Deposit <br />$1,251.00 <br />Major Streets Deposit <br />$1,666.00 <br />Monitoring Well Quarterly <br />$1,584.00 <br />Memorialize existing lane closure fees. These fees (3-5 days/2 week period/3 week period/4 week period) from SAPIN are already collected <br />by the City but are not listed on the fee schedule. This is 3-5 days -triple (3 x $396.00), 2 week period -quadruple (4 x $396.00), 3 week <br />period -quintuple (S x $396.00)., 4 week period -sextuple (6 x $396.00), Quarterly -quadruple (4 x $396.00) the traffic occupancy or lane <br />closure requiring signage per day fee. <br />Page 148 of 151 <br />