Laserfiche WebLink
ACCOUNT <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />51604 <br />PLANNING &BUILDING AGENCY <br />FISCAL YEAR 2024-2025 FEE SCHEDULE <br />SECTION X <br />MISCELLANEOUS FEE <br />235) <br />Fire Damper <br />236) <br />Install/Repair/Replace Appliance Vent <br />237) <br />Product Conveying System (Flammable Vapors, Fumes, Smoke, Heat) <br />238) <br />Dust Collection System <br />239) <br />Appliance Not Listed <br />240) <br />System Not Listed (Halon, Smoke Evac, Crematory, Etc.) <br />241) <br />Absorption System <br />Up to 1,000,000 BTU <br />242) <br />1,000,001 to 1,750,000 BTU <br />243) <br />1,750,001 and over <br />244) <br />Commercial Cooking Equipment (Ovens/Fryers/Etc.) <br />245) <br />Condensate Pump <br />246) <br />Kiln <20cubic feet (includes hood and duct) <br />247) <br />Air Compressor (each includes piping) <br />UNIT ADOPTED PROPOSED DEPARTMENT <br />FY 23-24 FEES FY 24-25 FEES CHANGES <br />76.11 <br />79.66 <br />76.11 <br />79.66 <br />218.63 <br />228.82 <br />218.63 <br />228.82 <br />76.11 <br />79.66 <br />218.63 <br />228.82 <br />90.87 <br />95.10 <br />129.18 <br />135.20 <br />218.63 <br />228.82 <br />49.71 <br />52.03 <br />37.13 <br />38.86 <br />76.67 <br />80.24 <br />76.67 <br />80.24 <br />Page 82 of 151 <br />