Laserfiche WebLink
• <br /> Huntington Beach City Water Meter Replacement and Edison Line Extension Project <br /> (Sub J & L) (2016) <br /> 3 months ($200,000) <br /> Installation of over 10 new Edison line extensions for panel upgrades. Skill sets included <br /> trenching, civil, electrical, and utility avoidance plans. Installation of water and sewer laterals as <br /> well for multiple housing developments. <br /> Ruben Chase (Prime Chase Construction) <br /> (714) 914-6346 <br /> TransPak Fireline Repair Project(General J & L) (2016) <br /> 8 months <br /> Installation and repair of primary 18" fireline to industrial park. Skill sets included civil, <br /> mechanical, heavy equipment and import/export backfill.Along with asphalt paving and <br /> concrete paving. <br /> Balboa Bay Beach Club Transformer Upgrades Project(Sub J &L) (2017) <br /> 3 months ($100,000) <br /> Installation of Primary and Secondary Edison feeds to docks B, C, and D. Skill sets included, <br /> electrical, civil, underground structures, and OSHA deep trench shoring. Dewatering as well. <br /> Mike King (714) 767-6453 <br /> King Electric <br /> Balboa Bay Beach Club Prime Electrician <br /> Outlets at San Clemente Tesla Supercharger Project(General Potential Electrical) (2017) <br /> 2 months ($200,000) <br /> Installation of 21 Tesla Charging Stations. Skill sets included civil, electrical, pipe fitting, <br /> equipment installation, utility avoidance, import/export and concrete. <br />