| The work under this item consists of grading, compacting subgrade, constructing 12"wide by
<br /> 			12"deep AC Hot Mix on compacted subgrade, and constructing PCC Curb &Gutter(outside of
<br />			the curb ramp footprint, beyond the BCR or ECR) in accordance with the provisions of Section
<br />			301-1,"Subgrade Preparation,"and Section 303-5, "Concrete Curbs,Walks, Gutters, Cross
<br />			Gutters,Alley Intersections,Access Ramps,and Driveways"and any City Standard
<br />			Specifications,plans, and/or any City's Special Provisions/Contract Documents provided by the
<br />			City for each Task Order.
<br />			Payment for PCC Curb & Gutter(A-2-8) shall be at the contract unit price bid per Linear Foot
<br />			as listed in the Fee Proposal, and shall include full compensation for doing all work, including
<br />			furnishing all materials, labor,equipment,tools, and incidentals as required and no additional
<br />			compensation will be allowed therefore.
<br />			Item No. 5-Furnish and Install New#6 Pull Box
<br />			The work under this item for Furnish and Install New#6 Pull Box shall be in accordance with
<br />			the latest CA MUTCD, Caltrans and any City Standard Specifications,plans, and/or any City's
<br /> 			Special Provisions/Contract Documents to be provided for each Task Order Work. The assumed
<br />			material for placement shall be concrete and any removal of an existing pull box shall be
<br />			included in the price paid to furnish and install a new pull box and no additional payment will be
<br />			allowed therefore.
<br />			Payment for Furnish and Install New#6 Pull Box shall be at the contract unit price paid per
<br />			Each as listed in the Fee Proposal, and shall include full compensation for doing all work,
<br />			including furnishing all materials, labor, equipment,tools,and incidentals as required and no
<br />			additional compensation will be allowed therefore.
<br />			Item No. 6-Adjust Manhole to Finished Grade
<br />			Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each
<br />			as listed in the Fee Proposal, and shall include full compensation for doing all work, including
<br />			furnishing all materials, labor,equipment,tools, and incidentals as required and no additional
<br />			compensation will be allowed therefore.
<br />			Item No. 7- Catch Basin (Type"B,"W=10')
<br />			The work under this item consists of grading, compacting subgrade, and constructing Catch
<br />			Basin and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation,"
<br />			and Section 303-1, "Concrete Structures"and any City Standard Specifications,plans, and/or
<br />			any City's Special Provisions/Contract Documents provided by the City for each Task Order.
<br />			Payment for Catch Basin (Type "B,"W=10') shall be at the contract unit price paid per Each as
<br />			listed in the Fee Proposal,and shall include full compensation for doing all work, including
<br />			removal or replacement of existing catch basins and/or other appurtenances, including furnishing
<br />			all materials,labor,equipment,tools, and incidentals as required to construct a new catch basin,
<br /> 			soil preparation and compaction, and no additional compensation will be allowed therefore.
<br />      								City of Santa Ana RFP 23-182
<br />  										Page Al-9