My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EXCEL PAVING COMPANY (PALP INC.)
Clerk
>
Contracts / Agreements
>
E
>
EXCEL PAVING COMPANY (PALP INC.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 10:58:02 AM
Creation date
6/18/2024 10:57:58 AM
Metadata
Fields
Template:
Contracts
Company Name
EXCEL PAVING COMPANY (PALP INC.)
Contract #
A-2024-069-03
Agency
Public Works
Council Approval Date
5/21/2024
Expiration Date
5/20/2027
Insurance Exp Date
6/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sample Task Order C Items of Work <br /> Item No. 1 - Unclassified Excavation <br /> Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in <br /> the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br /> materials, labor, equipment,tools, and incidentals as required and no additional compensation <br /> will be allowed therefore. <br /> Payment for unclassified fill, if any,is considered as included in the unit price paid for <br /> unclassified excavation. <br /> Payment for over-excavation shall be paid for at the unit price for unclassified excavation. <br /> Item No. 2 -Asphalt Concrete (AC) Pavement <br /> Payment for Asphalt Concrete (AC) Pavement shall be at the contract unit price bid per Ton as <br /> listed in the Fee Proposal, and shall include full compensation for doing all work, including <br /> furnishing all materials,labor,equipment, tools, and incidentals as required and no additional <br /> compensation will be allowed therefore. <br /> Payment for asphalt concrete pavement used in areas of over-excavation to mitigate unsuitable <br /> subgrade materials shall be paid for at the contract unit price bid per ton. <br /> Item No. 3—Remove and Replace 18" Corrugated Metal Pipe(CMP) <br /> The work under this item consists of grading, compacting subgrade, and constructing Remove <br /> and Replace 18"Corrugated Metal Pipe (CMP)and shall be in accordance with the provisions of <br /> Section 306,"Underground Conduit Construction" and any City Standard Specifications,plans, <br /> and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br /> Order. <br /> Payment for Remove and Replace 18" Corrugated Metal Pipe(CMP) shall be at the contract <br /> unit price paid per Linear Foot as listed in the Fee Proposal, and shall include full compensation <br /> for doing all work,including removal or replacement of existing pipe, furnishing all materials, <br /> labor,equipment,tools,and incidentals as required to install new pipe,bedding preparation, and <br /> no additional compensation will be allowed therefore. <br /> Item No. 4—Remove and Replace 18" Reinforced Concrete Pipe <br /> The work under this item consists of grading, compacting subgrade, and constructing Remove <br /> and Replace 18"Reinforced Concrete Pipe and shall be in accordance with the provisions of <br /> Section 306, "Underground Conduit Construction"and any City Standard Specifications,plans, <br /> and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br /> Order. <br /> City of Santa Ana RFP 23-182 <br /> Page A1-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.