QUANTITIES FOR FEE SCHEDULE(UNDER SEPARATE COVER) <br /> For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the <br /> following work items and quantities are provided. The Fee Schedule in Attachment 5: <br /> Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and <br /> subcontractor staff and labor personnel.Additionally, for each discipline that a company seeks to <br /> be considered, the below table(s) shall be completed. For example, if a General Contractor is <br /> submitting for Asphalt Concrete and Concrete Work, Sample Task Orders A and B would both <br /> be required to be completed as part of the Fee Schedule. Each table shall include the filling in of <br /> the last two columns for the relevant sample task orders for whichever category(ies) are being <br /> submitted for consideration. However, actual work will be paid for as described in Section I <br /> "Nature of Work."Sample Task Orders for Asphalt Concrete,Concrete Paving, Stormdrain,and <br /> Street Lighting within the public right-of-way related work are,respectively: <br /> Sample Task Order A—Asphalt Concrete <br /> Item Description Qty Unit Unit Price Total <br /> 1 Unclassified Excavation 550 CY $320.00 $176,000.00 <br /> 2 AC Pavement 130 TN $310.00 $40,300.00 <br /> 3 Furnish and Install#6 Pullbox 4 EA $2,000.00 $8,000,00 <br /> 4 Adjust Manhole to Finished Grade 5 EA $1,600.00 $8,000.00 <br /> 5 PCC Curb&Gutter(Type A-2-8) 100 LF $157.00 $15,700.00 <br /> 6 Signing&Srtiping 1 LS $9,800.00 $9,800.00 <br /> 7 Traffic Control Work 1 LS $48,000.00 $48,000.00 <br /> Sample Task Order B— Concrete Paving <br /> Item Description Qty Unit Unit Price Total <br /> 1 Unclassified Excavation 550 CY $320.00 $176,000.00 <br /> 2 FCC Sidewalk(T=4") 2,500 SF $23.00 $57,500.00 <br /> 3 PCC Curb Ramp 3,000 SF $42.00 $126,000.00 <br /> 4 PCC Curb&Gutter(Type A-2-8) 100 LF $157.00 $15,700.00- <br /> 5 Furnish and Install#6 Pullbox 4 EA $2,000.00 $8,000.00 <br /> 6 Adjust Manhole to Furnished Grade 5 EA $1,600.00 $8,000.00 <br /> 7 Catch Basin(Type"B",W=10') 1 EA $14,000.00 $14,000.00 <br /> 8 Remove and Replace 30"Reinforced Concrete 75 LF $450.00 $33,750.00 <br /> Pipe <br /> 9 Guard Rail Replacement(Caltrans RSP A77N4) 50 LF $180.00 $9,000.00 <br /> 1.0 Guard Rail Replacement(Caltrans) 1 EA $11,000.00 $11,000.00 <br /> 11 Remove and Replace Chain Link R%W Fence 50 LF $194.00, $9,700.00 <br /> 12 Concrete Barrier Type 83 (Caltrans) 50 LF $600.00 $30,000.00 <br /> 13 Traffic Control Work 1 LS $59,000.00 $59,000.00 <br /> City of Santa Ana RFP 23-182 <br /> Page Al-2 <br />