Laserfiche WebLink
Time and Material Rates for Excel Paving for On-Call Emergency AC, Concrete, and <br /> Stormdrain Repair Services,REP#: 23-182 <br /> Excel Paving T&M Rates <br /> Category Description Cost/nR <br /> Labor Superintendent $ 150.00 <br /> Labor Foreman $ 115.00 <br /> Labor Operator $ 112.00 <br /> Labor Laborer $ 90.00 <br /> Labor Teamster $ 90.00 <br /> Labor Cagaenter $ 95.00 <br /> Labor Cement Mason Foreman $ 115.00 <br /> Labor Cement Mason $ 98.00 <br /> Labor Mason Laborer Group 2 $ 96.00 <br /> Labor Mason Laborer Group 1 $ 95.00 <br /> Equipment skip $ 50.00 <br /> Equipment roller $ 45.00 <br /> Equipment paving machine $ 150.00 <br /> Equipment water truck $ 30.00 <br /> Equipment street sweeper $ 200.00 <br /> Equipment backhoe $ 85.00 <br /> Equipment saw $ 68.00 <br /> Equipment blade or loader $ 80.00 <br /> Equipment truck-Super 10 $ 85.00 <br /> Equipment move truck $ 40.00 <br /> Equipment Foreman Truck $ 47.00 <br /> Equipment. Tool Truck $ 50.00 <br /> Equipment Form Truck $ 60.00 <br /> Any Labor or Equipment not listed above will be billed per Company's(Excel's and subs')standard T&M rates. <br /> The Labor rates are only for regular business hours from 7:00 am to 5:00 pm Monday through Friday. <br /> Anytime outside of regular business hours of operation will be considered after hours/weekends. <br /> After hours work includes overtime,double-time,and/or holiday time,and will be billed per actual premium time rates. <br /> The Labor rates are good through June 30,2025. Excel will submit revised Labor rates on July 1,2025. <br /> All material costs will be added to the cost proposal per actual invoices. <br /> Excel Paving will add the following mark-ups to the costs: <br /> Category Markup % <br /> Labor 20% <br /> Equipment 15% <br /> Material-except Concrete 10%_ <br /> Material-Concrete 15% <br /> Sub(first$5,000) 10% <br /> Sub(over$5,001) 5% <br /> Bond 1% <br />